Line 145: | Line 145: | ||
− | + | ||
− | |||
* After hall work is done and everybody is out of the hall call for sweep and close the hall for "Beam Permit", this should be done before 3pm, April 23 | * After hall work is done and everybody is out of the hall call for sweep and close the hall for "Beam Permit", this should be done before 3pm, April 23 | ||
* When hall is closed ask MCC to ram up the tagger magnet in preparation for beam delivery, also ask to change helicity reporting scheme to "Delay reporting, 8-windows" for the Moller run | * When hall is closed ask MCC to ram up the tagger magnet in preparation for beam delivery, also ask to change helicity reporting scheme to "Delay reporting, 8-windows" for the Moller run | ||
Line 161: | Line 160: | ||
*Except for SVT, turn on HVs for all detectors. Call SVT expert to turn ON SVT. | *Except for SVT, turn on HVs for all detectors. Call SVT expert to turn ON SVT. | ||
− | |||
− | |||
− | |||
Line 169: | Line 165: | ||
* From around Monday 8am (April 30), beam studies is scheduled for about 8 hours. Once the beam is off, turn off all detector HV's, except SVT and MVT which you should notify the corresponding experts to do so. Please notify Ruben (and enigneering on call), about the scheduled magnet studies. They are schedule to be in the counting house around 8:30. If not, notify them by phone. Youri and Latifa also needs access and please coordinate with them as well. Francesco (MVT expert), Sergey/DAQ/BEN (DAQ) should also be notified for scheduled hall work. | * From around Monday 8am (April 30), beam studies is scheduled for about 8 hours. Once the beam is off, turn off all detector HV's, except SVT and MVT which you should notify the corresponding experts to do so. Please notify Ruben (and enigneering on call), about the scheduled magnet studies. They are schedule to be in the counting house around 8:30. If not, notify them by phone. Youri and Latifa also needs access and please coordinate with them as well. Francesco (MVT expert), Sergey/DAQ/BEN (DAQ) should also be notified for scheduled hall work. | ||
− | *Most likely the beam studies will be done around 4pm | + | *Most likely the beam studies will be done around 4pm. |
+ | * After hall work is done and everybody is out of the hall call for sweep and close the hall for "Beam Permit". Magnet group should have already ramped up the magnet by now. If not, ask either engineer on call or PDL to ramp up the magent. | ||
+ | |||
+ | * When hall is closed ask MCC to ram up the tagger magnet in preparation for beam delivery, also ask to change helicity reporting scheme to "Delay reporting, 8-windows" for the Moller run | ||
+ | * Fill the target while beam is down (if the target was emptied earlier -- TBA) | ||
+ | |||
+ | * When MCC will be ready to send beam, notify run coordinator and beamline expert (Stepan). | ||
+ | |||
+ | Follow instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to get an acceptable beam profile. | ||
+ | |||
+ | *Once the beam profile is satisfying (2C21:[https://logbooks.jlab.org/entry/3539650], 2C24:[https://logbooks.jlab.org/entry/3539651], perform Moller runs (follow Moller procedure). | ||
+ | |||
+ | * Three moller measurements will be done: A. Half wave plate in, Wien angle at 50 degrees; B. Half wave plate in, Wien angle at 50+25.8 degrees; C. Half wave plate in, Wien angel at 50-25.8 degrees. Each setting takes ~15minutes to set up, and about an hour for the run. For each setting, please notify/request MCC, and also notify Hall C as well. | ||
+ | |||
+ | |||
+ | * After the Moller runs, we will end with half wave plate in OUT position. Then take the beam away, turn off Moller setup, degauss tagger magnet and send a 5nA beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font> | ||
+ | |||
+ | *Once the beam is on the Faraday cup and all halo counter rates are normal, perform 2H01 harp scan (see "Establish-physics quality beam" procedure). | ||
+ | |||
+ | * After physics quality beam is established to Faraday cup, set correct FSD thresholds for 50nA run on LH2 target (see https://logbooks.jlab.org/entry/3564642) and ask MCC to send 50 nA. | ||
+ | *Except for SVT/MVT, turn on HVs for all detectors. Call SVT/MVT expert to turn ON SVT/MVT. | ||
+ | *Then resume production data taking. | ||
− | |||
− | + | May 1st/May 2nd: On May 2nd around noon time, there is a scheduled tour of Hall B. Please notify PDL to ramp down the magnets if he is not in the counting house already. The RF recovery might happen during this tour, hopefully (or it might happen on Tuesday May 1st). Once the tour concludes, PDL will ramp up the magnet again. Once this is done, and all detectors ready, pleasze refer below and resume produciton run. If the beam is not good, then we should reestablish the beam by following the procedures (on the right). | |
Revision as of 15:14, 29 April 2018
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Spring 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Lei Guo
- (757) 575-7540
- 9 575 7540 from Counting Room
- lguo@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
The integrated rates on UPSTREAM counters has to be in the range 0-15 Hz (rates up 100 Hz are acceptable) and MIDSTREAM has to be in the rage 10-20 Hz (acceptable up to 50 Hz) @50 nA. Count rates in the range of hundreds or more may indicate bad beam tune or bleed-through from other Halls.
- Note 2: At the end of each run, follow the DAQ restart sequence
"end run", "cancel", "reset", then
if run ended correctly "download", "prestart", "iocjscalerRestartAll.sh", "go".
if run did not ended correctly, or ROCs had to be rebooted "Configure", "download", "prestart", "iocjscalerRestartAll.sh", "go".
After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh.
Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C24A (X=0.5,Y=0.5) , 2H01 (X=1.0 mm, Y=-1.0 mm) see log entry https://logbooks.jlab.org/entry/3560786.
- Note 4: Do not turn OFF FTOF HVs, even during the beam tune
- Note 5: In case of the Torus and/or Solenoid Fast Dump do the following -
- Notify MCC, request beam OFF and drop Hall status to Power Permit
- Call Engineering on-call
- Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" filed add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
- Notify Run Coordinator
- Call the MM expert to turn the detector off
- Call SVT expert to turn SVT off
- Turn off all the other detectors
- Note 6: When beam is being delivered to the Faraday Cup -
- the Fast Shut Down: Upstream, Midstream, Downstream, BOM and Solenoid should be always Unmasked,
- No changes to the FSD threshold without RC or beamline expert approval.
- Note 7: Do not turn on or off SVT - only SVT expert can do that
- Note 8: Any request for a special run or change of configuration has to be approved by RC & documented.
- Note 9: Check carefully BTA every hour and run script btaGet.py . It will print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.
- Note 10: Reset CLAS12MON frequently to avoid histogram saturation.
Run Plan: April 29-May 2April 29 (Sunday) Day - Aprl 30 (Monday) Owl
Sometimes, a couple of RICH channel scalers would go to 0 and there is no alarm, even though the "# of fjibers connected" would be shown to be the correct 138. Shift takers therefore should periodically, especially at the end of run, check the RICH scalers GUI. If there is an issue, please refer to the instruction below.
Follow instructions in the "Establish-physics quality beam" procedure at [1] to get an acceptable beam profile.
Follow instructions in the "Establish-physics quality beam" procedure at [4] to get an acceptable beam profile.
In case of other questions or uncertainties of what to do, please call the RC
|
General Instructions:
Every Shift:
Every Run: Log screenshots of:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|