Difference between revisions of "Run Group A"
Line 130: | Line 130: | ||
* At 9:00 a.m. there will be pass change for Hall A so no beam for couple of hours during the day shift | * At 9:00 a.m. there will be pass change for Hall A so no beam for couple of hours during the day shift | ||
* Run plan will be update after 8:00 a.m. MCC meeting for the day shift | * Run plan will be update after 8:00 a.m. MCC meeting for the day shift | ||
− | * | + | * When beam is off for pass change ask MCC to energize the tagger |
− | + | * During this time test target filling | |
− | |||
1) Before the start of beam delivery: | 1) Before the start of beam delivery: | ||
* When Hall B goes into Restricted Access and before beam comes into the hall, make sure all CLAS12 detectors are turned off | * When Hall B goes into Restricted Access and before beam comes into the hall, make sure all CLAS12 detectors are turned off | ||
* Check that torus field is -100% (negatives inbending) and solenoid field is -100% (contact PDL to change fields) | * Check that torus field is -100% (negatives inbending) and solenoid field is -100% (contact PDL to change fields) | ||
− | + | 1) Complete beam tuning studies - <font color="red">This effort will be carried out under the direction of the beamline expert</font> | |
* Complete beam tuning to the tagger yoke beam dump following the procedures in the beam tuning document | * Complete beam tuning to the tagger yoke beam dump following the procedures in the beam tuning document | ||
* Take a Moller run | * Take a Moller run | ||
Line 146: | Line 145: | ||
* Ensure FSD settings are proper | * Ensure FSD settings are proper | ||
− | + | 2) With empty target: | |
* With 5 nA beam, turn on CLAS12 detectors from least sensitive to most sensitive (call SVT and MM experts to turn their systems on). | * With 5 nA beam, turn on CLAS12 detectors from least sensitive to most sensitive (call SVT and MM experts to turn their systems on). | ||
* Check DAQ rates and trigger performance with May 2018 setup. The current trigger configuration : trigger_v20_1.trg. This work will be completed under the direction of the DAQ expert. | * Check DAQ rates and trigger performance with May 2018 setup. The current trigger configuration : trigger_v20_1.trg. This work will be completed under the direction of the DAQ expert. | ||
+ | |||
+ | 4) Once all everything is checked: | ||
+ | |||
+ | a) Fill the target (call Bob Miller for this step; number on whiteboard) | ||
+ | |||
+ | b) Turn beam back on at 5 nA - ensure FSD settings are proper | ||
+ | |||
+ | c) Complete DC HV setting scan | ||
+ | * See log entry [https://logbooks.jlab.org/entry/3590854 3590854] for settings. Take data for 15 min with 10 nA for each setting. Be sure to reset to the fault HV settings at the end of the test plan R1/R2/R3 #8/#9/#9. | ||
+ | |||
+ | <!-- | ||
* Complete MM setting optimization. This work will be completed under the direction of the MM experts. | * Complete MM setting optimization. This work will be completed under the direction of the MM experts. | ||
* Take empty target run (8 hrs at 20 nA) | * Take empty target run (8 hrs at 20 nA) |
Revision as of 09:18, 28 September 2018
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Fall 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.
- Note 2: At the end of each run, follow the standard DAQ restart sequence
"end run", "cancel", "reset", then if the run ended correctly, "download", "prestart", "iocjscalerRestartAll.sh", "go". If the run did not end correctly or if any ROCs had to be rebooted, "configure", "download", "prestart", "iocjscalerRestartAll.sh", "go".
After each step, make sure it is complete in the Run Control message window. If a ROC has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C24A (X=0.5 mm, Y=0.5 mm) , 2H01 (X=1.0 mm, Y=-1.0 mm) see log entry 3570290
- Note 4: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline)
- Note 5: In case of a Torus and/or Solenoid Fast Dump do the following:
- Notify MCC to request beam OFF and to drop Hall B status to Power Permit
- Call Engineering on-call
- Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" field add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
- Notify Run Coordinator
- Turn off all detectors
- Note 6: When beam is being delivered to the Faraday Cup:
- the Fast Shut Down elements: Upstream, Midstream, Downstream, BOM, and Solenoid should always be in the state UNMASKED
- No changes to the FSD threshold should be made without RC or beamline expert approval
- Note 7: Do not turn on the SVT or MM - only the SVT or MM expert can do that
- Note 8: Any request for a special run or change of configuration has to be approved by the RC & documented
- Note 9: Carefully check the BTA every hour and run the script btaGet.py to print for you what HAS TO BE in BTA for this hour. Edit BTA if it is incorrect.
- Note 10: Reset CLAS12MON frequently to avoid histogram saturation.
Start-up Run Plan:(Updated: Sep. 28, 2018 at 3:00 a.m.)
1) Before the start of beam delivery:
1) Complete beam tuning studies - This effort will be carried out under the direction of the beamline expert
2) With empty target:
4) Once all everything is checked: a) Fill the target (call Bob Miller for this step; number on whiteboard) b) Turn beam back on at 5 nA - ensure FSD settings are proper c) Complete DC HV setting scan
Shift Worker Notes:
In case of other questions or uncertainties of what to do, call the RC |
General Instructions:
Every Shift:
Every Run: Log screenshots of:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|