Line 77: | Line 77: | ||
== Start close-up of the Hall at 3pm on Friday, February 3 == | == Start close-up of the Hall at 3pm on Friday, February 3 == | ||
− | * | + | === Locking up the hall on Fridays === |
− | + | * At 2pm check the status of the activities in the hall and notify RC if there are potential delays for the lockup at 3pm. | |
+ | * Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm: | ||
+ | ** Vacuum is good, magnet power supplies (Tagger and Torus) are turned ON and in remote mode, LCW is on. | ||
+ | * Make sure experts, beamline, ECal, DC, HTCC, FTOF, and slow controls, checked their systems before the lockup. | ||
+ | * When ready notify MCC to start sweep and lockup of the hall. | ||
+ | * Make sure all necessary monitoring GUIs are up and running. | ||
+ | * Make sure beam viewer screens are up. | ||
+ | * When hall reaches "Beam Permit": | ||
+ | ** Ramp torus to 10% of max current (380A) | ||
+ | ** Turn all beamline devices ON, turn all CLAS12 detectors OFF </font> | ||
+ | |||
+ | |||
== Establish beam to the tagger dump == | == Establish beam to the tagger dump == | ||
# See "General Instructions" on the right for details | # See "General Instructions" on the right for details | ||
Line 113: | Line 124: | ||
#* Quick no-collimator rate measurement</strike> | #* Quick no-collimator rate measurement</strike> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
=== Important Notes: === | === Important Notes: === | ||
# '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | # '''Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
==<font color=blue><b>General Instructions:</b></font>== | ==<font color=blue><b>General Instructions:</b></font>== | ||
Line 155: | Line 137: | ||
# If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | # If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Establishing Acceptable Beam Conditions:=== | ===Establishing Acceptable Beam Conditions:=== |
Revision as of 17:30, 29 January 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 2 - 3, 2017 :Start close-up of the Hall at 3pm on Friday, February 3Locking up the hall on Fridays
Establish beam to the tagger dump
Bring beam to FC:
Important Notes:
General Instructions:DAQ RECOVERYIf DAQ crashed/broken:
Establishing Acceptable Beam Conditions:
Note: in order to have reliable readings on two important for HPS BPMs, 2H00 and 2H02, beam current should be >30 nA.
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
| |
Every Shift:
|
Every Run:
|
---|