Difference between revisions of "Engineering Run"
(4 intermediate revisions by 3 users not shown) | |||
Line 73: | Line 73: | ||
</center> | </center> | ||
− | == RC: | + | == RC: Silvia Niccolai == |
− | * (757) 575- | + | * (757) 575-7540 |
− | * 9 575 | + | * 9 575 7540 from Counting Room |
− | * | + | * silvia@jlab.org |
− | == PDL: | + | == PDL: Maurizio Ungaro == |
* (757) 876-1789 | * (757) 876-1789 | ||
* 9 876-1789 from Counting Room | * 9 876-1789 from Counting Room | ||
− | * | + | * ungaro@jlab.org |
<br> | <br> | ||
Line 206: | Line 206: | ||
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures] | * [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures] | ||
* [https://wiki.jlab.org/clas12-run/index.php/Run_Group_A Run Group A Wiki] | * [https://wiki.jlab.org/clas12-run/index.php/Run_Group_A Run Group A Wiki] | ||
− | * [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis | + | * [https://clasweb.jlab.org/wiki/index.php/Run_Group_A Run Group A Analysis Wiki] |
+ | * [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Engineering Run Analysis Wiki] | ||
* [http://clasweb.jlab.org/rcdb RCDB] | * [http://clasweb.jlab.org/rcdb RCDB] | ||
| valign=top | | | valign=top | |
Revision as of 14:36, 31 January 2019
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Silvia Niccolai
- (757) 575-7540
- 9 575 7540 from Counting Room
- silvia@jlab.org
PDL: Maurizio Ungaro
- (757) 876-1789
- 9 876-1789 from Counting Room
- ungaro@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)
- Note 4: With beam to the Faraday Cup, typical rates pn all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/4 - 14:30) All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [1]), integration time is set to 5 ms, and that the orbit locks are on.
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B |
Accelerator |
Bluejean meetings
|