Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 78: | Line 78: | ||
| valign=top width=50% | | | valign=top width=50% | | ||
− | == <font color=blue>''' Run Plan for February | + | == <font color=blue>''' Run Plan for February 3 - 4, 2017 : '''</font>== |
+ | == Target position at 13.125 (2H01 harp, can be moved using expert GUI), Beam current 5 nA (FC) == | ||
+ | Take data, 2 hours a run: | ||
+ | CODA configuration - <b> FC_DC </b> | ||
+ | Triger file - <b> trigger/kpp1.trg </b> | ||
+ | <!-- | ||
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == | == The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == | ||
Line 86: | Line 91: | ||
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | ||
− | + | ||
== Establish beam to the tagger yoke dump == | == Establish beam to the tagger yoke dump == | ||
# Work with MCC to establish beam on the tagger yoke dump - <b>This is the first time we are running to this new dump, record everything, rates in some of halo counters can be away off the chart. Consult with RC if you see something very unusual. </b> | # Work with MCC to establish beam on the tagger yoke dump - <b>This is the first time we are running to this new dump, record everything, rates in some of halo counters can be away off the chart. Consult with RC if you see something very unusual. </b> |
Revision as of 23:17, 3 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 3 - 4, 2017 :Target position at 13.125 (2H01 harp, can be moved using expert GUI), Beam current 5 nA (FC)Take data, 2 hours a run: CODA configuration - FC_DC Triger file - trigger/kpp1.trg Important Notes:
|
General Instructions:Locking up the hall
Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|