Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 91: | Line 91: | ||
# Reverse torus polarity, <b> Set point = -1900 A </b>. First ramp down torus to zero, by setting 0 in the set point, then ramp up to -1900 A. | # Reverse torus polarity, <b> Set point = -1900 A </b>. First ramp down torus to zero, by setting 0 in the set point, then ramp up to -1900 A. | ||
# Take data with reverse field, Sector-2 only, high EC-inner threshold | # Take data with reverse field, Sector-2 only, high EC-inner threshold | ||
− | # Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): | + | # After the run meeting (~4:00pm) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): |
#*Do harp scans - 2C21, "tagger", and 2H01 | #*Do harp scans - 2C21, "tagger", and 2H01 | ||
#*Run 2H01 at low speed (speed=0.1) to 13.3 position and save strip chart of motor position together with downstream halo counters | #*Run 2H01 at low speed (speed=0.1) to 13.3 position and save strip chart of motor position together with downstream halo counters | ||
#*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rateson halo counters. | #*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rateson halo counters. | ||
− | + | # Continue data taking with reverse field till 9pm, Sector-2 only, high EC-inner threshold | |
+ | # Change torus setting to positive polarity, 1900 A set point, continue data taking | ||
<!-- | <!-- | ||
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == | == The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == |
Revision as of 12:14, 4 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 4-5, 2017 :
Plan:
Important Notes:
|
General Instructions:Locking up the hall
Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |