== <font color=blue>''' Run Plan:'''</font>==
+
 
 +
{| {{TableStyle1}}
 +
 
 +
| valign=top width=50% |
 +
== <font color=blue>''' Run Plan: Nov 10 - 11 2021 '''</font>==  
 +
 
 +
* Wednesday
 +
** Owl - Production data at 50nA
 +
** Day - Production data at 50nA
 +
** Swing - Production data at 50nA
 +
 
 +
*Thursday
 +
** Owl - Production data at 50nA
 +
** 7am Request Restricted Access, Ramp Down the magnets, Empty and warm up target
 +
** 7am Contact Eugene as soon as beam off
 +
 
 +
 
 +
* Please note that we have added two items to the list of tasks for each run.
 +
** (1) When you collect the gui snapshots for the logbook (scalar gui, FTC Asym plot, livetime, ROC rates, beamline stripcharts) <b>include the DAQ gui</b> AND make sure the snapshot is taken when you're running. We want to record the rate plots on the DAQ gui.
 +
** (2) Measure the <b>trigger structure</b> (trigger-time distribution) about every 30 minutes and at least once per run enter the results in the logbook. See below for instructions. This is needed to monitor the injector laser phase which created serious problems last week.
 +
* If the trigger-time distribution or region 1 DC occupancies get worse ( > 6.5%) call the RC. What we will likely do is reduce the beam and restart.
 +
* At some later time we need to do an empty target run. Current will be 150 nA for 50M triggers which should take 2-3 hours.
 +
------
 +
 
 
<!--
 
<!--
 
<i>(Updated: Oct. 3 2018 at 14:30)</i>
 
<i>(Updated: Oct. 3 2018 at 14:30)</i>
Line 148: Line 171:
 
** With good beam it will take approximately 4-6 hours.
 
** With good beam it will take approximately 4-6 hours.
 
-->
 
-->
 
[[File:SummaryRGMTargets.png]]
 
 
* Any questions call system expert, RC or PDL.
 
  
 
== <font color=blue>''' Shift Worker Notes:'''</font>==
 
== <font color=blue>''' Shift Worker Notes:'''</font>==
Line 162: Line 181:
 
** For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273.  This would apply in the cases of  1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call.
 
** For RICH recovery procedures, please see Log entry https://logbooks.jlab.org/entry/3562273.  This would apply in the cases of  1. DAQ crash: rich4 is not responding or 2. RICH alarms (LV,missing tile, temperature etc). If it does not work or you are uncertain about what to do, contact the RICH expert on call.
 
-->
 
-->
'''In case of other questions or uncertainties of what to do, call the RC'''
+
'''In case of other questions or uncertainties of what to do, call the RC or PDL'''
  
 
<!--
 
<!--

Revision as of 13:08, 3 November 2021

[edit]

If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]

Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Run Group M, Summer 2020
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!


RC: TBD

Rc list.png

PDL: Valery Kubarovsky




Run Plan: Nov 10 - 11 2021

  • Wednesday
    • Owl - Production data at 50nA
    • Day - Production data at 50nA
    • Swing - Production data at 50nA
  • Thursday
    • Owl - Production data at 50nA
    • 7am Request Restricted Access, Ramp Down the magnets, Empty and warm up target
    • 7am Contact Eugene as soon as beam off


  • Please note that we have added two items to the list of tasks for each run.
    • (1) When you collect the gui snapshots for the logbook (scalar gui, FTC Asym plot, livetime, ROC rates, beamline stripcharts) include the DAQ gui AND make sure the snapshot is taken when you're running. We want to record the rate plots on the DAQ gui.
    • (2) Measure the trigger structure (trigger-time distribution) about every 30 minutes and at least once per run enter the results in the logbook. See below for instructions. This is needed to monitor the injector laser phase which created serious problems last week.
  • If the trigger-time distribution or region 1 DC occupancies get worse ( > 6.5%) call the RC. What we will likely do is reduce the beam and restart.
  • At some later time we need to do an empty target run. Current will be 150 nA for 50M triggers which should take 2-3 hours.


Shift Worker Notes:

In case of other questions or uncertainties of what to do, call the RC or PDL

General Instructions:

Every Shift:

  • Follow run plan as outlined by RC
  • If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
  • Document any beam condition change and send scaler GUIs to HBLOG
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
  • Fill and submit the shift checklist in the logbook

Every Run:

Log screenshots of: (this is for the remote shifter, see dedicated tab above.)

  • Main beamline GUI overview
  • clas12mon Detector occupancy plots
  • Trigger rate GUI
  • FT-Cal FADC scalers

Overview

Tasks


Shift Worker Backup Table

Worker Shift Backup
Date Day Swing Owl
Fri, Oct 15 John Doe Jane Doe Domenico D'Urso
Sat, Oct 16 Jane Doe Bob Cat Alber Einstein
Backup shifter contact info
Name Email Cell phone
John Doe john.doe@roma2.infn.it +123456789
Jane Doe a@b + 987654321


Clas12design.png