+ | <!--####################################### Short Term Schedule #############################################--> | ||
= Short Term Schedule = | = Short Term Schedule = | ||
− | + | ||
− | ''' CLAS12 Run Group M, Fall 2021 </font> ''' | + | === <font color=blue size=4> ''' CLAS12 Run Group M, Fall 2021 </font> ''' === |
''' Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass) '''<br> | ''' Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass) '''<br> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | == RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640) == | + | === RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640) === |
* (757) 575-7540 | * (757) 575-7540 | ||
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
* [mailto:susansch@jlab.org susansch@jlab.org] | * [mailto:susansch@jlab.org susansch@jlab.org] | ||
− | == PDL: Valery Kubarovsky == | + | === PDL: Valery Kubarovsky === |
* (757) 876-1789 | * (757) 876-1789 | ||
* 9 876-1789 from Counting Room | * 9 876-1789 from Counting Room | ||
Line 88: | Line 85: | ||
− | == <font color=blue>''' Run Plan: Jan 26 - Jan 30 2022 '''</font>== | + | == <font color=blue>''' Run Plan: Jan 26 - Jan 30 2022 '''</font> == |
Production runs use <b> PROD67_noVTPread </b> and the trigger <b> rgm_6GeV_inb_v1_0.trg </b>.<br/> | Production runs use <b> PROD67_noVTPread </b> and the trigger <b> rgm_6GeV_inb_v1_0.trg </b>.<br/> | ||
Line 118: | Line 115: | ||
* Monday pass change (6GeV beam) | * Monday pass change (6GeV beam) | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 140: | Line 131: | ||
− | + | == <font color=blue> References and Standards '</font>== | |
− | == <font color=blue> | + | ''(last update 01/18/2022- 23:30)'' |
− | ''(last update 01/18/2022- 23:30 | ||
<b> Nominal Beam Positions </b> | <b> Nominal Beam Positions </b> | ||
Line 169: | Line 159: | ||
<b> Beamline vacuum: </b> should be not higher than 5e-5. | <b> Beamline vacuum: </b> should be not higher than 5e-5. | ||
− | + | ||
= Notes/Known Issues = | = Notes/Known Issues = | ||
Line 175: | Line 165: | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
− | | valign=top | | + | | valign=top, width=50%| |
== <font color=blue> Notes </font> == | == <font color=blue> Notes </font> == | ||
Line 185: | Line 175: | ||
* Note 2: Be very mindful of the background '''rates''' in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels. | * Note 2: Be very mindful of the background '''rates''' in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels. | ||
− | The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls. | + | ** The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls. |
* Note 3: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline) | * Note 3: Do not turn OFF FTOF HVs, even during the beam tune with CW beam (turn off if tuned/pulsed beam in the upstream beamline) | ||
Line 202: | Line 192: | ||
*Note 6: Any request for a '''special run or change of configuration''' has to be approved by the RC & documented | *Note 6: Any request for a '''special run or change of configuration''' has to be approved by the RC & documented | ||
− | *Note 7: | + | *Note 7: Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. |
− | Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | ||
*Note 8: '''Reset CLAS12MON''' frequently to avoid histogram saturation. | *Note 8: '''Reset CLAS12MON''' frequently to avoid histogram saturation. | ||
Line 213: | Line 202: | ||
*Note 11: If responding to '''RICH or Trigger alarms''' please post screens also to RICH or HBTRIGGER logbook, respectively. | *Note 11: If responding to '''RICH or Trigger alarms''' please post screens also to RICH or HBTRIGGER logbook, respectively. | ||
− | *Note 12 | + | *Note 12: '''Cycle the FMT Gas once per shift'''. If it is not reset, the interlock may drop and disable the HV. |
− | |||
− | *Note | + | *Note 13: The error messages " ERR: Event ..." for crates tdcband1, tdcecal1 and tdcecal6 are NOT a problem |
<!-- | <!-- |
Revision as of 23:26, 26 January 2022
- Shift Documentation
- Phone Numbers
- Short Term Schedule
- Notes/Known Issues
- Shift Expert
- Remote Worker Shift
- Monitoring
- Useful Links
Shift ScheduleESAD, COO, RSADShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[ten digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640)
- (757) 575-7540
- 9 575 7540 from Counting Room
- susansch@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Jan 26 - Jan 30 2022
Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg .
Run duration 100M events or 4 hours, whichever comes first.
- Get Beam (pass2, 4 GeV beam)
- harp scans
- target centering
- if BEFORE 9pm:
- fill Ar target
- luminosity scan - increase downstream halo FSD threshold, if needed
- beam blocker calibration (during day)
- run for 2 days
- if AFTER 9pm:
- insert C target
- decide 80 or 90 nA
- beam blocker calibration
- run 12 hours
- switch to Ar (2 days)
- switch back to C
- Sunday switch to LH2
- take C data while purging ?
- 1 shift LH2
- beam blocker calibration
- 4 hours empty target
- Monday pass change (6GeV beam)
DAQ configuration
PROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg .
At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE
- "end run", if the run ended correctly then: "prestart", "go"
- if the run did not end correctly or if any ROCs had to be rebooted:
- "cancel", "reset"
- "configure", "download", "prestart", "go"
- After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
References and Standards '
(last update 01/18/2022- 23:30)
Nominal Beam Positions
- 2H01, X: -0.8 mm, Y: 0.4 mm
- 2C24, X: -2.0 mm, Y: +0.6 mm
FSD Thresholds
- Upstream: 2000 Hz
- Midstream: 2000 Hz
- Downstream: 500000 Hz
- BOM: 10000
- 5 ms dwell time
Reference Harp Scans for Beam on Faraday Cup: 2H01 [1]
Reference Harp Scans for Beam on Tagger dump: 2C21 [2], tagger harp [3]
Reference Monitoring Histograms (6 nA, production C) [4] Old reference Monitoring Histograms (50 nA, production LD2) [5]
Counter rates
- Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
- Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
- Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.
Beamline vacuum: should be not higher than 5e-5.
Notes
|
Known Issues
|
In case of other questions or uncertainties of what to do, call the RC or PDL (remote) shift worker: see dedicated Remote Shifts tab above. |