Difference between revisions of "Run Group M"
Line 131: | Line 131: | ||
− | == <font color=blue> References and Standards | + | == <font color=blue> References and Standards </font>== |
''(last update 01/18/2022- 23:30)'' | ''(last update 01/18/2022- 23:30)'' | ||
Line 158: | Line 158: | ||
<b> Beamline vacuum: </b> should be not higher than 5e-5. | <b> Beamline vacuum: </b> should be not higher than 5e-5. | ||
− | |||
− | |||
= Notes/Known Issues = | = Notes/Known Issues = |
Revision as of 23:38, 26 January 2022
- Shift Documentation
- Phone Numbers
- Short Term Schedule
- Notes/Known Issues
- Shift Expert
- Remote Worker Shift
- Monitoring
- Useful Links
Shift ScheduleESAD, COO, RSADShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[ten digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640)
- (757) 575-7540
- 9 575 7540 from Counting Room
- susansch@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Jan 26 - Jan 30 2022
Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg .
Run duration 100M events or 4 hours, whichever comes first.
- Get Beam (pass2, 4 GeV beam)
- harp scans
- target centering
- if BEFORE 9pm:
- fill Ar target
- luminosity scan - increase downstream halo FSD threshold, if needed
- beam blocker calibration (during day)
- run for 2 days
- if AFTER 9pm:
- insert C target
- decide 80 or 90 nA
- beam blocker calibration
- run 12 hours
- switch to Ar (2 days)
- switch back to C
- Sunday switch to LH2
- take C data while purging ?
- 1 shift LH2
- beam blocker calibration
- 4 hours empty target
- Monday pass change (6GeV beam)
DAQ configuration
PROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg .
At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE
- "end run", if the run ended correctly then: "prestart", "go"
- if the run did not end correctly or if any ROCs had to be rebooted:
- "cancel", "reset"
- "configure", "download", "prestart", "go"
- After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
References and Standards
(last update 01/18/2022- 23:30)
Nominal Beam Positions
- 2H01, X: -0.8 mm, Y: 0.4 mm
- 2C24, X: -2.0 mm, Y: +0.6 mm
FSD Thresholds
- Upstream: 2000 Hz
- Midstream: 2000 Hz
- Downstream: 500000 Hz
- BOM: 10000
- 5 ms dwell time
Reference Harp Scans for Beam on Faraday Cup: 2H01 [1]
Reference Harp Scans for Beam on Tagger dump: 2C21 [2], tagger harp [3]
Reference Monitoring Histograms (6 nA, production C) [4] Old reference Monitoring Histograms (50 nA, production LD2) [5]
Counter rates
- Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
- Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
- Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.
Beamline vacuum: should be not higher than 5e-5.
Notes
|
Known Issues
|
In case of other questions or uncertainties of what to do, call the RC or PDL (remote) shift worker: see dedicated Remote Shifts tab above. |
TasksEvery Run:
|
|
Webcams
|
Manuals |
Hall Webcams |
Epics on the web
|
Live Monitoring Links
|
|
Hall-B
Run lists |
AcceleratorReferences |
ZOOM meetings
|