Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 99: | Line 99: | ||
* The hall will lock up on Jan. 11 at approximately 4 p.m. and shifts will be staffed in preparation for beam delivery. | * The hall will lock up on Jan. 11 at approximately 4 p.m. and shifts will be staffed in preparation for beam delivery. | ||
− | * When the hall is locked up, bring up the torus to 100% field (positive polarity, negatives inbending) | + | * When the hall is locked up, contact the Hall B Engineering Group to bring up the torus to 100% field (positive polarity, negatives inbending) and the solenoid to 100% field (nominal polarity). Tell MCC to bring the tagger magnet up to its nominal field for 5-pass beam when they are ready. |
* The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam (see the [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf instructions] for setting up the beam). The beamline expert should be present for this portion of the run plan. | * The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam (see the [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf instructions] for setting up the beam). The beamline expert should be present for this portion of the run plan. | ||
* Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. | * Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. |
Revision as of 14:10, 11 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: The FT-Off configuration is presently set up - the FT components should be left off.
- Note 2: Due to issues with the gas handling system with the MM trackers (BMT and FMT), these components should be left off.
- Note 3: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 4: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|