Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 110: | Line 110: | ||
* When the solenoid is at 0% field, ramp the torus down to 0% field. | * When the solenoid is at 0% field, ramp the torus down to 0% field. | ||
* At 6 a.m. call to have the hall put into Restricted Access for FT-Off to FT-On configuration change. | * At 6 a.m. call to have the hall put into Restricted Access for FT-Off to FT-On configuration change. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
== <font color=blue>''' Beam Tuning:'''</font>== | == <font color=blue>''' Beam Tuning:'''</font>== | ||
Line 143: | Line 129: | ||
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) | ||
+ | |||
+ | | valign=top | | ||
+ | |||
+ | ==<font color=blue>''' General Instructions''':</font>== | ||
+ | |||
+ | * During beam tuning and harp scans Hall-B halo FSD must be masked. | ||
+ | * For a given beam current, compute the FSD thresholds according to the [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam] document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds. | ||
+ | * The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown. | ||
+ | * Do not run more than 60 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations. | ||
+ | * Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data. | ||
+ | * In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218 | ||
+ | * With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. | ||
+ | * All jscaler iocs (iocjscalerX) on the health screen under DAQ tab) must be restarted after every DAQ prestart is completed. | ||
+ | * Check that no unecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens. | ||
==Every Shift:== | ==Every Shift:== |
Revision as of 20:40, 14 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm)
Run Plan:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|