Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 68: | Line 68: | ||
<center><font color=blue size=4> | <center><font color=blue size=4> | ||
''' CLAS12 Engineering Run, Winter 2018 </font> '''<br> | ''' CLAS12 Engineering Run, Winter 2018 </font> '''<br> | ||
− | ''' Beam energy | + | ''' Beam energy 2.1 GeV (1 pass) '''<br> |
''' Important: Document all your work in the logbook! '''<br> | ''' Important: Document all your work in the logbook! '''<br> | ||
''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1frfBlq51qDXZD6fW5rcRefNXSGdVvdMozKUlAVNoUGc/edit?usp=sharing run list] at the beginning and end of each run (clas12run@gmail.com can fill the run list)'''<br> | ''' Remember to fill in the [https://docs.google.com/spreadsheets/d/1frfBlq51qDXZD6fW5rcRefNXSGdVvdMozKUlAVNoUGc/edit?usp=sharing run list] at the beginning and end of each run (clas12run@gmail.com can fill the run list)'''<br> | ||
Line 97: | Line 97: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | * | + | * Mon. Jan. 15: Work on configuration change from FT-Off to FT-On (day and swing shifts cancelled) |
− | * | + | * Tue. Jan. 16: Finish work on configuration change. Look to lock up Hall B at noon. (owl and first half of day shifts cancelled) |
− | * | + | |
− | + | * Begin 1-pass program by tuning 10 nA beam to the tagger magnet yoke dump. Follow the beam tuning procedures for Hall B on the run wiki under Procedures. The beamline expert will oversee this work. Before beam is delivered to Hall B make sure that all detectors are off and the target is empty. The tagger magnet should be at its appropriate setting for the 1-pass energy. The torus and solenoid should be at 100% field (both positive polarity). | |
− | * Take calibration data | + | * When the beam tune is acceptable in the upstream beam line, turn off/degauss the tagger magnet and tune 10 nA beam to the Faraday Cup. The beamline expert will oversee this work. |
− | + | * When physics quality beam is established to the Faraday Cup, turn on the forward detectors (ECAL, FTOF, LTCC, HTCC, RICH). Record rates and currents in the logbook. | |
− | * | + | * Fill the cryotarget. |
− | ** | + | * Turn on the remaining detector systems. Note all rates/currents/occupancies in the logbook. |
− | ** | + | * Set up the DAQ for production running. |
− | + | * Trigger studies: Optimize the triggers for normalization studies. Study and optimize the FT trigger. | |
− | + | * Take calibration data for CLAS12 at currents of 10 nA and 50 nA (π<sup>0</sup> events in FT). The FT expert will help to optimize the trigger and conditions for this step. | |
− | + | * Physics studies: | |
− | + | ** Take data at 100% torus field, 50 nA for 24 hours | |
+ | ** Take data at 50% torus field, 50 nA for 24 hours | ||
== <font color=blue>''' Beam Tuning:'''</font>== | == <font color=blue>''' Beam Tuning:'''</font>== |
Revision as of 10:57, 15 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm)
Run Plan:
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|