===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://bta Beam Time Accounting]===
 
===[https://bta Beam Time Accounting]===
 +
===[https://www.jlab.org/Hall-B/run-web/comm/ESAD_HallB-CLAS12_rgA.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/comm/COO_HallB-CLAS12_rgA.pdf COO], [https://www.jlab.org/Hall-B/run-web/comm/RSAD_HallB-CLAS12_rgA.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
  
 
<br><br>
 
<br><br>
===[https://wiki.jlab.org/clas12-run/images/7/74/HallB_KPP_Demo.pdf Draft CLAS12 KPP Demo Slides]===
+
===[https://wiki.jlab.org/clas12-run/images/e/e2/Offline_-shift-schedule.pdf Off-line shift schedule]===
 +
 
 +
<br><br>
 +
===[https://wiki.jlab.org/clas12-run/images/8/80/HallB_KPP_Demo_data-3.pdf CLAS12 KPP Demonstration Slides]===
  
 
| valign=top |
 
| valign=top |
Line 40: Line 44:
  
 
| valign=top |
 
| valign=top |
 +
 
===JLab Logbooks===
 
===JLab Logbooks===
 
<font size=3>
 
<font size=3>
Line 64: Line 69:
 
''' Beam energy 6.4 GeV (3 pass) '''<br>
 
''' Beam energy 6.4 GeV (3 pass) '''<br>
 
''' Important: Document all your work in the logbook! '''<br>
 
''' Important: Document all your work in the logbook! '''<br>
 +
== <font color=red>''' Very Successfull Run '''</font>==
 
<!--<font size=3>[https://bluejeans.com/573852742 Bluejeans for Run Meetings on Thursdays and Fridays at 2pm]</font></center>-->
 
<!--<font size=3>[https://bluejeans.com/573852742 Bluejeans for Run Meetings on Thursdays and Fridays at 2pm]</font></center>-->
 
</center>
 
</center>
Line 80: Line 86:
 
== <font color=blue>''' Run Plan for February 4-5, 2017 : '''</font>==
 
== <font color=blue>''' Run Plan for February 4-5, 2017 : '''</font>==
 
   
 
   
*Target position <b> 13.125 </b> (2H01 harp, can be moved using button on the main scaler GUI or using the expert GUI)  
+
*Target position <b> 10.505 </b> (2H01 harp, can be moved using button on the main scaler GUI or using the expert GUI)  
 
*Beam current <b> 5 nA </b> (use Faraday Cup)
 
*Beam current <b> 5 nA </b> (use Faraday Cup)
*Beam positons on 2H01 nA BPM <b> x=0.4, y=1 </b>
+
*Beam positons on 2H01 nA BPM <b> x=0.38, y=0.905 </b>
*CODA configuration - <b> FC_DC </b>
+
*CODA configuration - <b> SECTOR2_SVT (sector2 trigger with SVT) <del>SECTOR2 (sector2 only trigger), FC_DC (6-sectors)</del></b>
 
*Triger file - <b> trigger/kpp1.trg </b>
 
*Triger file - <b> trigger/kpp1.trg </b>
 
*Take data, 2 hours a run
 
*Take data, 2 hours a run
*Keep track of runs, run#, torus seting, target positon, # of triggers, start/end time, trigger rate
+
*Keep track of runs, run#, torus seting, target position, # of triggers, start/end time, trigger rate
  
 
=== Plan: ===
 
=== Plan: ===
Line 94: Line 100:
 
# <del>Study tracking efficiency: four HV setings: 8, 9, 10, 11, 12, for each HV four threshold settings: 30, 45, 60, 75. 10 min runs each.</del>
 
# <del>Study tracking efficiency: four HV setings: 8, 9, 10, 11, 12, for each HV four threshold settings: 30, 45, 60, 75. 10 min runs each.</del>
 
# <del>Continue with data taking torus at -1900 A, target at 13.125, DC HV setting #11, thresholds 45 mV </del>
 
# <del>Continue with data taking torus at -1900 A, target at 13.125, DC HV setting #11, thresholds 45 mV </del>
# Switch target (call RC) and continue data taking till Sunday morning
+
# <del> Switch target (call RC) and continue data taking till Sunday morning </del>
# Change torus polarity, setting +1900 A. While torus current is changing, perform harp scans and FSD studies (see below)
+
# <del>Change torus polarity. While torus current is changing, perform harp scans and FSD studies (see below)</del>
# (Sunday) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>):
+
# <del>(Sunday morning while torus setting gets changed) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>):</del> done
#*<del>Do harp scans - 2C21, "tagger", and 2H01</del> done while changing the torus setting
+
#*<del>Do harp scans - 2C21, "tagger", and 2H01 </del>
#*<del>Run 2H01 at low speed (speed=0.1) to 13.3 position and save strip chart of motor position together with downstream halo counters</del> done while changing the torus setting, the first carbon target was found at ~10.6
+
#*<del>Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rates on halo counters.  </del>
#*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rateson halo counters.   
+
# <del>Take one 30 min run with torus at zero </del> done
# Continue data taking at 1900 A, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts)
+
# Set torus +1900 A, continue data taking, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts)
# Switch to 6-sector trigger, take data till Monday morning.
+
#* <del>take one run for 3 hours at low luminosity. Move beam in vertical direction up (or down does not matter) with 0.1 mm steps untill rates on downstream counters will be ~5kHz</del>done. x10 lower rates on downstream halo couters (luminosity monitor)
# <b> Run ends 7 am on Monday</b>
+
# <del> Take short ~1 hour, random trigger data (Sergei should be in to set  it up). Should happen before goimg to 6-sector trigger ~9 pm </del>
 +
# Switch to 6-sector trigger (some time ~11pm), take data till Monday morning.
 +
# <b> Run ends 6:45 am on Monday. Following has to be done:
 +
#* End the run, turn OFF HVs for all detectors, Start Ramping torus down to zero
 +
#* Retract the target using 2H01 expert GUI, just put -10 in the left "MoveAbs" and hit the return. Motor will go towards 0, and will hit "Lo Limit" limit switch
 +
#* Ask MCC to change beam current to 50nA with small steps, this is to calibrate SLM (data goes to MYA, but you can record beam current and the SLM reading if you want)
 +
#* When finished, got to 50nA, ask MCC to terminate the beam and take the Hall to restricted access.
 +
#* When torus reaches to 0 turn the PS OFF.</b>
 
<!--
 
<!--
 
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 ==
 
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 ==

Latest revision as of 13:44, 25 July 2024

[edit]


Clas12design.png