Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
(17 intermediate revisions by 5 users not shown) | |||
Line 9: | Line 9: | ||
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]=== | ===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]=== | ||
===[https://bta Beam Time Accounting]=== | ===[https://bta Beam Time Accounting]=== | ||
+ | ===[https://www.jlab.org/Hall-B/run-web/comm/ESAD_HallB-CLAS12_rgA.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/comm/COO_HallB-CLAS12_rgA.pdf COO], [https://www.jlab.org/Hall-B/run-web/comm/RSAD_HallB-CLAS12_rgA.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] === | ||
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== --> | <!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== --> | ||
Line 73: | Line 74: | ||
</center> | </center> | ||
− | == RC: | + | == RC: Silvia Niccolai == |
− | * (757) 575-7540 | + | * (757) 575-7540 |
* 9 575 7540 from Counting Room | * 9 575 7540 from Counting Room | ||
− | * | + | * silvia@jlab.org |
− | == PDL: | + | == PDL: Maurizio Ungaro == |
* (757) 876-1789 | * (757) 876-1789 | ||
* 9 876-1789 from Counting Room | * 9 876-1789 from Counting Room | ||
− | * | + | * ungaro@jlab.org |
<br> | <br> | ||
Line 91: | Line 92: | ||
* Note 3: Nominal beam positions: '''2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)''' | * Note 3: Nominal beam positions: '''2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)''' | ||
− | * Note 4: With beam to the Faraday Cup, typical rates | + | * Note 4: With beam to the Faraday Cup, typical rates pn all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls. |
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 98: | Line 99: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 2/ | + | ''(last update 2/4 - 14:30)'' |
All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | ||
Line 105: | Line 106: | ||
<!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947). --> | <!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947). --> | ||
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | <!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | ||
− | * Take data with PROD/elec_htcc_1phe_pcal_300.trg at | + | * Take 2 hour data runs with PROD/elec_htcc_1phe_pcal_300.trg at 30 nA with the following DC HV and thresholds: |
− | * | + | ** R1: #9/-45 mV, R2: #10/-65 mV, R3: #10/-60 mV |
− | + | ** R1: #8/-30 mV, R2: #10/-65 mV, R3: #9/-45 mV | |
− | + | ** R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV | |
+ | * Take data at 35 nA with PROD/elec_htcc_1phe_pcal_300.trg until morning; runs should be 2 hrs in length. Use R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV | ||
* Hall B work for Monday: | * Hall B work for Monday: | ||
** Ramp down solenoid (torus can stay up) (RC) | ** Ramp down solenoid (torus can stay up) (RC) | ||
+ | ** Empty the hydrogen target (Hall B Engineering) | ||
** Complete shielding addition outside scattering chamber (Hall B Engineering) | ** Complete shielding addition outside scattering chamber (Hall B Engineering) | ||
** Restore beamline (Hall B Engineering) | ** Restore beamline (Hall B Engineering) | ||
− | ** Replace FT-Hode mezzanine board (N. | + | ** Replace FT-Hode mezzanine board (N. Zachar) |
** Work on DC cable swaps (M. Cook + M. Mestayer) | ** Work on DC cable swaps (M. Cook + M. Mestayer) | ||
** Work on vacuum gauge (D. Anderson) | ** Work on vacuum gauge (D. Anderson) | ||
Line 203: | Line 206: | ||
===Hall-B=== | ===Hall-B=== | ||
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures] | * [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures] | ||
− | * [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis | + | * [https://wiki.jlab.org/clas12-run/index.php/Run_Group_A Run Group A Wiki] |
+ | * [https://clasweb.jlab.org/wiki/index.php/Run_Group_A Run Group A Analysis Wiki] | ||
+ | * [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Engineering Run Analysis Wiki] | ||
* [http://clasweb.jlab.org/rcdb RCDB] | * [http://clasweb.jlab.org/rcdb RCDB] | ||
| valign=top | | | valign=top | |