Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
''(last update 1/24 - 10:00 am)'' | ''(last update 1/24 - 10:00 am)'' | ||
− | * Once work in the Hall is complete, ramp the solenoid up to - | + | * <s>Once work in the Hall is complete, ramp the solenoid up to -60% (RC or PDL will do it). Once solenoid is at field, ramp torus to +60% (inbending electrons).</s> |
− | * Ask MCC to ramp the tagger magnet up to prepare for beam tuning. | + | * <s>Ask MCC to ramp the tagger magnet up to prepare for beam tuning.</s> |
− | * When MCC will inform you that they are ready to send beam, turn most sensitive detectors off including trackers (SVT, MVT, FTT, DC), Central Detectors (CTOF, CND) and RICH: refer to the manuals or call the experts for any questions. | + | * <s>When MCC will inform you that they are ready to send beam, turn most sensitive detectors off including trackers (SVT, MVT, FTT, DC), Central Detectors (CTOF, CND) and RICH: refer to the manuals or call the experts for any questions.</s> |
− | * Prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Consult with the beamline expert in case of issues. | + | * <s>Prepare to re-establish beam following the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Consult with the beamline expert in case of issues.</s> |
− | * Once beam is tuned to the FC, switched all detectors on. Call the SVT expert to switch the SVT on. Restore DC HV setting to be (8,9,9) for Region 1, 2 and 3, respectively. Refer to https://logbooks.jlab.org/entry/3519236 for the procedure. Compare the values displayed in the GUI with what reported in the table on pg. 5 and 6 of the DC manual at [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf] to ensure the settings are correct. Contact the DC expert or the RC if needed. | + | * <s>Once beam is tuned to the FC, switched all detectors on. Call the SVT expert to switch the SVT on. Restore DC HV setting to be (8,9,9) for Region 1, 2 and 3, respectively. Refer to https://logbooks.jlab.org/entry/3519236 for the procedure. Compare the values displayed in the GUI with what reported in the table on pg. 5 and 6 of the DC manual at [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf] to ensure the settings are correct. Contact the DC expert or the RC if needed.</s> |
− | * Make sure FSD threshold are set correctly for the specific beam current used in the following runs. | + | * <s>Make sure FSD threshold are set correctly for the specific beam current used in the following runs.</s> |
− | * Start data taking at 60% field (negatives inbending) and solenoid to - | + | * Start data taking at 60% field (negatives inbending) and solenoid to -60% field: |
** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. | ||
** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 30 min of data. Record trigger scaler gui. |
Revision as of 19:36, 24 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/24 - 10:00 am)
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|