Line 100: | Line 100: | ||
* Continue data taking at 100% torus field (negatives inbending) and solenoid to 100% field. DAQ configuration PROD6 (selected by clicking on Configure before the Download), trigger file elec_htcc_1phe_pcal_300.trg (selected at the Download), beam position as indicated above. Make sure FSD thresholds are set correctly (refer to the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | * Continue data taking at 100% torus field (negatives inbending) and solenoid to 100% field. DAQ configuration PROD6 (selected by clicking on Configure before the Download), trigger file elec_htcc_1phe_pcal_300.trg (selected at the Download), beam position as indicated above. Make sure FSD thresholds are set correctly (refer to the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | ||
* Once the RICH special runs are complete, start readout/trigger studies. | * Once the RICH special runs are complete, start readout/trigger studies. | ||
− | * Take data at 30 nA with increased TET thresholds on FTOF | + | * Take data at 30 nA with increased TET thresholds on FTOF and CTOF: |
− | ** TET 150: 1 | + | ** TET 150: 1 hr run |
− | ** TET 200: 1 | + | ** TET 200: 1 hr run |
* Switch to HTCC studies. Ask the DAQ expert to load gains for the HTCC in fADC and take 4 runs with different trigger files, 30 min each: | * Switch to HTCC studies. Ask the DAQ expert to load gains for the HTCC in fADC and take 4 runs with different trigger files, 30 min each: | ||
− | ** elec_pcal_300.cnf: HTCC | + | ** elec_pcal_300.cnf: HTCC threshold is 0.5 phe |
** elec_htcc_1phe_pcal_300.cnf | ** elec_htcc_1phe_pcal_300.cnf | ||
** elec_htcc_3phe_pcal_300.cnf | ** elec_htcc_3phe_pcal_300.cnf | ||
** elec_htcc_5phe_pcal_300.cnf | ** elec_htcc_5phe_pcal_300.cnf | ||
− | * Switch to FT studies: ask the DAQ expert to select an | + | * Switch to FT studies: ask the DAQ expert to select an FT-only trigger, setting adequate prescale factors to keep the trigger rates at an acceptable level. Take three runs at different currents of 25, 50, 75 nA. |
− | |||
<!-- == <font color=blue>''' Beam Tuning:'''</font>== | <!-- == <font color=blue>''' Beam Tuning:'''</font>== |
Revision as of 12:07, 28 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=0.0 mm)
Run Plan:(last update 1/27 - 6:00 pm)
|
General Instructions:
Every Shift:
Every Run:
|