Difference between revisions of "Engineering Run"

From clas12-run
Jump to navigation Jump to search
Line 110: Line 110:
 
* DC threshold test: ask the DAQ expert to set the DC Region 2 thresholds to 60 mV and take one run (1 hr) at 30 nA with elec_htcc_1phe_pcal_300.cnf trigger. Once completed, revert to the nominal threshold of 45 mV.
 
* DC threshold test: ask the DAQ expert to set the DC Region 2 thresholds to 60 mV and take one run (1 hr) at 30 nA with elec_htcc_1phe_pcal_300.cnf trigger. Once completed, revert to the nominal threshold of 45 mV.
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations).
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations).
* Complete test plan to study optimal HV settings for MM (BMT,FMT)
+
* Complete test plan to study optimal HV settings for MM (BMT,FMT). This work will be led by the MM system experts.
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations).
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations).
 
* Continue trigger studies for the hadron trigger under the guidance of the DAQ/trigger experts.
 
* Continue trigger studies for the hadron trigger under the guidance of the DAQ/trigger experts.

Revision as of 14:57, 2 February 2018

[edit]


Clas12design.png