Line 110: | Line 110: | ||
* DC threshold test: ask the DAQ expert to set the DC Region 2 thresholds to 60 mV and take one run (1 hr) at 30 nA with elec_htcc_1phe_pcal_300.cnf trigger. Once completed, revert to the nominal threshold of 45 mV. | * DC threshold test: ask the DAQ expert to set the DC Region 2 thresholds to 60 mV and take one run (1 hr) at 30 nA with elec_htcc_1phe_pcal_300.cnf trigger. Once completed, revert to the nominal threshold of 45 mV. | ||
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations). | * Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations). | ||
− | * Complete test plan to study optimal HV settings for MM (BMT,FMT) | + | * Complete test plan to study optimal HV settings for MM (BMT,FMT). This work will be led by the MM system experts. |
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations). | * Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 5 nA; 2 hr long runs (low current runs for subsystem calibrations). | ||
* Continue trigger studies for the hadron trigger under the guidance of the DAQ/trigger experts. | * Continue trigger studies for the hadron trigger under the guidance of the DAQ/trigger experts. |