Line 106: Line 106:
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 
* Continue on trigger studies to develop/implement hadron trigger. This work will be led by the DAQ/trigger group.
 
* Continue on trigger studies to develop/implement hadron trigger. This work will be led by the DAQ/trigger group.
 +
* Take data for MM system performance evaluation at 75 nA for different HV settings. This work will be led by the MM experts.
 
* Take data for FT system calibrations at different beam currents. This work will be led by the FT expert.
 
* Take data for FT system calibrations at different beam currents. This work will be led by the FT expert.
* Take data for MM system calibrations at different beam currents. This work will be led by the MM experts.
+
* Take data to test the FT+hadron trigger performance at beam currents of 10, 30 and 50 nA. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs until morning.
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs until morning.
  

Revision as of 22:49, 2 February 2018