Line 106: | Line 106: | ||
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | <!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | ||
* Continue on trigger studies to develop/implement hadron trigger. This work will be led by the DAQ/trigger group. | * Continue on trigger studies to develop/implement hadron trigger. This work will be led by the DAQ/trigger group. | ||
+ | * Take data for MM system performance evaluation at 75 nA for different HV settings. This work will be led by the MM experts. | ||
* Take data for FT system calibrations at different beam currents. This work will be led by the FT expert. | * Take data for FT system calibrations at different beam currents. This work will be led by the FT expert. | ||
− | * Take data | + | * Take data to test the FT+hadron trigger performance at beam currents of 10, 30 and 50 nA. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting. |
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs until morning. | * Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs until morning. | ||