Difference between revisions of "Engineering Run"

From clas12-run
Jump to navigation Jump to search
Line 108: Line 108:
 
* Continue trigger development studies. This work will be led by the trigger/DAQ experts.
 
* Continue trigger development studies. This work will be led by the trigger/DAQ experts.
 
<!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.-->
 
<!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.-->
 +
 +
* Hall B work for Monday:
 +
** Ramp down solenoid (torus can stay up) (RC)
 +
** Complete shielding addition outside scattering chamber (Hall B Engineering)
 +
** Restore beamline (Hall B Engineering)
 +
** Replace FT-Hode mezzanine board (N. Zachary)
 +
** Work on DC cable swaps (M. Cook + M. Mestayer)
 +
** Work on vacuum gauge (D. Anderson)
 +
** Investigate polarity of busy signal (S. Boyarinov)
 +
** Setup gated/ungated scalers and clock scalers (S. Boyarinov)
  
 
<!-- == <font color=blue>''' Beam Tuning:'''</font>==
 
<!-- == <font color=blue>''' Beam Tuning:'''</font>==

Revision as of 15:35, 3 February 2018

[edit]


Clas12design.png