== <font color=blue>''' Run Plan:'''</font>==
 
== <font color=blue>''' Run Plan:'''</font>==
''(last update 2/3 - 08:30)''
+
''(last update 2/3 - 14:30)''
  
 
All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on.  
 
All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on.  
Line 118: Line 118:
 
** Investigate polarity of busy signal (S. Boyarinov)
 
** Investigate polarity of busy signal (S. Boyarinov)
 
** Setup gated/ungated scalers and clock scalers (S. Boyarinov)
 
** Setup gated/ungated scalers and clock scalers (S. Boyarinov)
 +
** SAF111 walkthrough (E. Pasyuk)
 
** Pass change (5-pass to 3-pass)
 
** Pass change (5-pass to 3-pass)
  