Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 106: | Line 106: | ||
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | <!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | ||
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs. | * Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs. | ||
+ | * Complete DC R2 HV/threshold scan: HV #10, thr=-45, 60, 65, 70 mV | ||
* Continue trigger development studies. This work will be led by the trigger/DAQ experts. | * Continue trigger development studies. This work will be led by the trigger/DAQ experts. | ||
<!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.--> | <!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.--> |