Difference between revisions of "Engineering Run"

From clas12-run
Jump to navigation Jump to search
Line 106: Line 106:
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs.
 
* Take data with PROD/elec_htcc_1phe_pcal_300.cnf at 35 nA; 2 hr long runs.
 +
* Complete DC R2 HV/threshold scan: HV #10, thr=-45, 60, 65, 70 mV
 
* Continue trigger development studies. This work will be led by the trigger/DAQ experts.
 
* Continue trigger development studies. This work will be led by the trigger/DAQ experts.
 
<!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.-->
 
<!--* Take data to test the FT+hadron trigger performance. Use PROD_noVTP/hadron_elec_htcc_1phe_pcal_300.trg. Take 30 minutes of data per setting.-->

Revision as of 17:26, 3 February 2018

[edit]


Clas12design.png