== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
− | ''(last update 2/ | + | ''(last update 2/4 - 14:30)'' |
All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on. | ||
Line 107: | Line 107: | ||
* Take data with PROD/elec_htcc_1phe_pcal_300.trg at 35 nA; 2 hr long runs. | * Take data with PROD/elec_htcc_1phe_pcal_300.trg at 35 nA; 2 hr long runs. | ||
* Complete DC R2 performance study: | * Complete DC R2 performance study: | ||
− | + | * Continue trigger development studies. This work will be led by the trigger/DAQ experts when they are ready | |
− | |||
− | |||
− | |||
− | * Continue trigger development studies. This work will be led by the trigger/DAQ experts | ||
− | |||
* Hall B work for Monday: | * Hall B work for Monday: |