Line 105: | Line 105: | ||
<!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947). --> | <!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947). --> | ||
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | <!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. --> | ||
− | * Take data with PROD/elec_htcc_1phe_pcal_300.trg at | + | * Take 2 hour data runs with PROD/elec_htcc_1phe_pcal_300.trg at 30 nA with the following DC HV and thresholds: |
− | * | + | ** R1: #9/-45 mV, R2: #10/-65 mV, R3: #10/-60 mV |
− | * | + | ** R1: #8/-30 mV, R2: #10/-65 mV, R3: #9/-45 mV |
+ | ** R1: #8/-30 mV, R2: #9/-45 mV, R3: #19/-45 mV | ||
+ | * Take data at 35 nA with PROD/elec_htcc_1phe_pcal_300.trg until morning; runs should be 2 hrs in length | ||
* Hall B work for Monday: | * Hall B work for Monday: |