Line 105: Line 105:
 
<!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947).  -->
 
<!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947).  -->
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
* Take data with PROD/elec_htcc_1phe_pcal_300.trg at 35 nA; 2 hr long runs.
+
* Take 2 hour data runs with PROD/elec_htcc_1phe_pcal_300.trg at 30 nA with the following DC HV and thresholds:
* Complete DC R2 performance study:
+
** R1: #9/-45 mV, R2: #10/-65 mV, R3: #10/-60 mV
* Continue trigger development studies. This work will be led by the trigger/DAQ experts when they are ready
+
** R1: #8/-30 mV, R2: #10/-65 mV, R3: #9/-45 mV
 +
** R1: #8/-30 mV, R2: #9/-45 mV, R3: #19/-45 mV
 +
* Take data at 35 nA with PROD/elec_htcc_1phe_pcal_300.trg until morning; runs should be 2 hrs in length
  
 
* Hall B work for Monday:
 
* Hall B work for Monday: