Line 116: Line 116:
 
** Complete shielding addition outside scattering chamber (Hall B Engineering)
 
** Complete shielding addition outside scattering chamber (Hall B Engineering)
 
** Restore beamline (Hall B Engineering)
 
** Restore beamline (Hall B Engineering)
** Replace FT-Hode mezzanine board (N. Zachary)
+
** Replace FT-Hode mezzanine board (N. Zachar)
 
** Work on DC cable swaps (M. Cook + M. Mestayer)
 
** Work on DC cable swaps (M. Cook + M. Mestayer)
 
** Work on vacuum gauge (D. Anderson)
 
** Work on vacuum gauge (D. Anderson)