Line 99: | Line 99: | ||
* Complete recovery from ESR event. | * Complete recovery from ESR event. | ||
− | ** Ramp the solenoid to 100% field (positive polarity) and the torus to 100% (negatives | + | ** Ramp the solenoid to 100% field (positive polarity) and the torus to 100% (negatives inbending; positive polarity) |
* Prepare for tuning using a 5 nA beam to the tagger yoke: SVT (contact expert to do it), MVT, CND, CTOF, FTT, HTCC, DC, FTOF should be off, tagger magnet should be on. Follow the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan to the standards at [https://logbooks.jlab.org/entry/3527777 2C21] and [https://logbooks.jlab.org/entry/3527790 2C24]. Consult with the beamline expert in case of issues. | * Prepare for tuning using a 5 nA beam to the tagger yoke: SVT (contact expert to do it), MVT, CND, CTOF, FTT, HTCC, DC, FTOF should be off, tagger magnet should be on. Follow the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan to the standards at [https://logbooks.jlab.org/entry/3527777 2C21] and [https://logbooks.jlab.org/entry/3527790 2C24]. Consult with the beamline expert in case of issues. | ||
* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup with a 5 nA beam. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the standard at [https://logbooks.jlab.org/entry/3527871 2H01]. | * If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup with a 5 nA beam. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the standard at [https://logbooks.jlab.org/entry/3527871 2H01]. |
Revision as of 19:29, 6 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)
- Note 4: With beam to the Faraday Cup, typical rates an all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/6 - 16:00) The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [1]), integration time is set to 5 ms, and that the orbit locks are on.
|
General Instructions:
Every Shift:
Every Run:
|