Line 9: Line 9:
 
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://accweb.acc.jlab.org/hco/readiness Hot Checkout]===
 
===[https://bta Beam Time Accounting]===
 
===[https://bta Beam Time Accounting]===
 +
===[https://www.jlab.org/Hall-B/run-web/comm/ESAD_HallB-CLAS12_rgA.pdf ESAD], [https://www.jlab.org/Hall-B/run-web/comm/COO_HallB-CLAS12_rgA.pdf COO], [https://www.jlab.org/Hall-B/run-web/comm/RSAD_HallB-CLAS12_rgA.pdf RSAD], [https://www.jlab.org/div_dept/train/SAF111/Hall%20B%20worker%20Safety%20Training%20%28SAF111%29%20%2008%2001-12-1.pdf ERG] ===
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
 
<!-- ===[https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc#CLAS12_Operations_Documentation Operations Documentation]=== -->
  
Line 18: Line 19:
 
* [https://wiki.jlab.org/clas12-run/images/d/d2/Ltcc_manual.pdf LTCC]
 
* [https://wiki.jlab.org/clas12-run/images/d/d2/Ltcc_manual.pdf LTCC]
 
* [https://clasweb.jlab.org/wiki/images/f/f1/HTCC_MANUAL.pdf HTCC]
 
* [https://clasweb.jlab.org/wiki/images/f/f1/HTCC_MANUAL.pdf HTCC]
* [https://clasweb.jlab.org/wiki/images/e/ea/RICH_Manual.pdf RICH]
+
* RICH: [https://clasweb.jlab.org/wiki/images/e/ea/RICH_Manual.pdf expert] [https://wiki.jlab.org/clas12-run/images/d/d9/RICH_Controls_mc.pdf novice]
 
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
 
* [https://clasweb.jlab.org/wiki/images/0/0f/Ctof_manual.pdf CTOF]
 
* [https://clasweb.jlab.org/wiki/images/9/97/Ops_manual_cnd.pdf CND]
 
* [https://clasweb.jlab.org/wiki/images/9/97/Ops_manual_cnd.pdf CND]
 
* [https://clasweb.jlab.org/wiki/images/9/96/Svt_operation_manual_v1_1.pdf  SVT]
 
* [https://clasweb.jlab.org/wiki/images/9/96/Svt_operation_manual_v1_1.pdf  SVT]
 
* [https://clasweb.jlab.org/wiki/images/a/ad/Documentation_Shifters_MVT.pdf MVT]
 
* [https://clasweb.jlab.org/wiki/images/a/ad/Documentation_Shifters_MVT.pdf MVT]
** [https://wiki.jlab.org/clas12-run/images/b/bf/MVT_for_Dummies.pdf MVT turn-on procedure]
+
<!--===** [https://wiki.jlab.org/clas12-run/images/b/bf/MVT_for_Dummies.pdf MVT turn-on procedure]===-->
 +
** [https://wiki.jlab.org/clas12-run/images/2/2d/MVT_for_Dummies_noFMT.pdf MVT turn on procedure]
 
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
 
* [https://clasweb.jlab.org/wiki/images/3/3b/FT-Manual.pdf FT]
 
* [https://clasweb.jlab.org/wiki/images/4/4d/Beamline_manual.pdf Beamline]
 
* [https://clasweb.jlab.org/wiki/images/4/4d/Beamline_manual.pdf Beamline]
Line 72: Line 74:
 
</center>
 
</center>
  
== RC: Daniel S. Carman ==
+
== RC: Silvia Niccolai ==
* (757) 575-7540
+
* (757) 575-7540
 
* 9 575 7540 from Counting Room
 
* 9 575 7540 from Counting Room
* carman@jlab.org
+
* silvia@jlab.org
  
== PDL: Eugene Pasyuk ==
+
== PDL: Maurizio Ungaro ==
 
*  (757) 876-1789  
 
*  (757) 876-1789  
 
* 9 876-1789 from Counting Room
 
* 9 876-1789 from Counting Room
* pasyuk@jlab.org
+
* ungaro@jlab.org
  
 
<br>
 
<br>
  
* Note 1: Due to issues with the gas handling system with the MM trackers (BMT and FMT), the HV should be left off but the LV should be turned on.
+
* Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
  
* Note 2: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
+
* Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
  
* Note 3: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
+
* Note 3: Nominal beam positions: '''2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)'''
 +
 
 +
* Note 4: With beam to the Faraday Cup, typical rates pn all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
  
 
{| {{TableStyle1}}  
 
{| {{TableStyle1}}  
Line 95: Line 99:
  
 
== <font color=blue>''' Run Plan:'''</font>==
 
== <font color=blue>''' Run Plan:'''</font>==
 +
''(last update 2/4 - 14:30)''
  
* <s>When the hall is in beam permit, contact the Hall B Engineering Group to bring up the torus to 100% field (positive polarity, negatives inbending) and the solenoid to 100% field (nominal polarity). Tell MCC to bring the tagger magnet up to its nominal field for 5-pass beam when they are ready.</s>
+
All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]), integration time is set to 5 ms, and that the orbit locks are on.  
* <s>The first task when beam is available is to tune the beam to the tagger magnet yoke dump. Follow the instructions under the "Procedures" link on the Run Info wikipage for setting up the beam  (see the [https://wiki.jlab.org/clas12-run/images/7/74/CLAS12_beamline_commissioning.pdf instructions] for setting up the beam). See the reference harp scans for 2C21 and 2C24 (tagger harp) under the beam tuning section. The beamline expert should be present for this portion of the run plan. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #1].</s>
 
* <s>Following beam tuning to the tagger magnet yoke, complete a Moller polarimeter run. The beamline expert should be present for this portion of the run plan. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #2].</s>
 
* When the beam tune in the upstream beamline is acceptable, ask MCC to turn off and then degauss the tagger magnet. Begin beam tuning to the Faraday Cup with 5 nA of beam. This work will include harp scans at 2C21, 2C24, and 2H01 (see the reference plots under the beam tuning section). Also complete target scans to find the nominal beam position. The beamline expert should be present for this portion of the run. Make sure to put screen captures of the main scaler GUI in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #3].
 
* When the beam tuning is completed, begin detector turn on with 10 nA of beam on the empty target cell. Turn on the Forward Carriage detectors first (ECAL, FTOF, LTCC, HTCC, RICH) - contacting the subsystem teams to perform this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #4].
 
* Fill the cryotarget following the instructions next to the target computer. Contact Hall B Engineering for any questions. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #5].
 
* Continue detector turn on now for the DC, CTOF, CND, and SVT - contacting the subsystem teams to perform this work. Record rates and current for all detectors in the logbook. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #6].
 
* Begin initial DAQ and trigger checkout to re-establish the DAQ and basic electron trigger from the Dec. 2017 run. This work will be led by the DAQ and trigger experts. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #7].
 
* Work on detector setup optimization steps to set DC readout windows for R1, R2, and R3, and the PMT-based detector TDC readout windows to match the FADC windows. This work will be led by the DAQ expert in conjunction with the subsystem experts. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #8].
 
* If necessary complete studies of the DC HV settings and DCRB thresholds. This work will be led by the DC expert. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #9].
 
* Work on optimizing the electron trigger. This work will be led by the trigger team. This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #10].
 
* Begin solenoid rate studies and luminosity scans with both torus polarities at full torus field. These studies will be detailed here soon.
 
  
| valign=top |
+
<!-- * Prepare for beam tuning to the tagger yoke: SVT (contact expert to do it), MVT, CND, CTOF, FTT, HTCC, DC, FTOF should be off, tagger magnet should be on. Follow the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan to the ones performed on 1/25 swing shift (https://logbooks.jlab.org/entry/3520873 and https://logbooks.jlab.org/entry/3520881). Consult with the beamline expert in case of issues. -->
 +
<!--* If beam profiles at the tagger are acceptable, move to beam tuning to the Faraday Cup. Again, refer to the instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. Compare harp scan with the one from 1/25 swing shift (https://logbooks.jlab.org/entry/3520947).  -->
 +
<!--* Once beam to Faraday Cup is established, prepare to start data taking. Switch on all detectors; contact expert to switch on SVT. Start trigger studies following instructions from the DAQ expert. -->
 +
* Take 2 hour data runs with PROD/elec_htcc_1phe_pcal_300.trg at 30 nA with the following DC HV and thresholds:
 +
** R1: #9/-45 mV, R2: #10/-65 mV, R3: #10/-60 mV
 +
** R1: #8/-30 mV, R2: #10/-65 mV, R3: #9/-45 mV
 +
** R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV
 +
* Take data at 35 nA with PROD/elec_htcc_1phe_pcal_300.trg until morning; runs should be 2 hrs in length. Use R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV
  
==<font color=blue>''' General Instructions''':</font>==
+
* Hall B work for Monday:
 +
** Ramp down solenoid (torus can stay up) (RC)
 +
** Empty the hydrogen target (Hall B Engineering)
 +
** Complete shielding addition outside scattering chamber (Hall B Engineering)
 +
** Restore beamline (Hall B Engineering)
 +
** Replace FT-Hode mezzanine board (N. Zachar)
 +
** Work on DC cable swaps (M. Cook + M. Mestayer)
 +
** Work on vacuum gauge (D. Anderson)
 +
** Investigate polarity of busy signal (S. Boyarinov)
 +
** Setup gated/ungated scalers and clock scalers (S. Boyarinov)
 +
** SAF111 walkthrough (E. Pasyuk)
 +
** Pass change (5-pass to 3-pass)
  
* During beam tuning and harp scans Hall-B halo FSD must be masked.
+
<!-- == <font color=blue>''' Beam Tuning:'''</font>==
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 
* Do not run more than 60 minutes above 30 nA without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents.
 
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 
* In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
 
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
 
* All jscaler iocs (iocjscalerX) on the health screen under DAQ tab) must be restarted after every DAQ prestart is completed.  A button to do it all in one is available on the beamline overview screen
 
* Check that no unecessary beamline-related screens are open.  This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens.
 
 
 
== <font color=blue>''' Beam Tuning:'''</font>==
 
 
   
 
   
* Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. Turn DC HV off, leaving LV on. For SVT, MVT, FTH and FTT, first turn HV off and then LV off. For any problem, consult with the expert-on-call.
+
* <b>Whenever preparing to receive beam, make sure the following conditions are established: all CLAS12 detectors are off and target is empty. Turn DC HV off, leaving LV on. For SVT, MVT, FTH and FTT, first turn HV off and then LV off. For any problem, consult with the expert-on-call.</b>
 
* Establish beam to the tagger yoke first:  
 
* Establish beam to the tagger yoke first:  
 
*# ask MCC to energize the tagger dipole magnet and set the current as needed for dumping the beam in the designated dump on the tagger yoke. MCC will ask you to change (set) the beam delivery mode.  
 
*# ask MCC to energize the tagger dipole magnet and set the current as needed for dumping the beam in the designated dump on the tagger yoke. MCC will ask you to change (set) the beam delivery mode.  
Line 130: Line 133:
 
*# when the tagger magnet is at required setting ask MCC if they are ready to deliver beam to the tagger yoke dump (<=5 nA). It may take ~1 hour for MCC to setup and cleanly transport beam to the tagger yoke dump.  
 
*# when the tagger magnet is at required setting ask MCC if they are ready to deliver beam to the tagger yoke dump (<=5 nA). It may take ~1 hour for MCC to setup and cleanly transport beam to the tagger yoke dump.  
 
*# perform harp scans using the wire harp at 2C21 girder and 2C24 (tagger harp). Beam profile, peak position, width and signal/background ratio should be like in https://logbooks.jlab.org/entry/3507602 and https://logbooks.jlab.org/entry/3507605. Ask MCC to retune if needed (e.g. beam is too wide or asymmetric or has large tails),repeat the scan after every tune. Iterate to get acceptable beam profile.
 
*# perform harp scans using the wire harp at 2C21 girder and 2C24 (tagger harp). Beam profile, peak position, width and signal/background ratio should be like in https://logbooks.jlab.org/entry/3507602 and https://logbooks.jlab.org/entry/3507605. Ask MCC to retune if needed (e.g. beam is too wide or asymmetric or has large tails),repeat the scan after every tune. Iterate to get acceptable beam profile.
* send the beam to Faraday Cup dump:
+
* Send the beam to Faraday Cup dump:
 
*# CLAS12 detectors should be OFF, the solenoid magnet current is at 50% its max, torus is at 100%.
 
*# CLAS12 detectors should be OFF, the solenoid magnet current is at 50% its max, torus is at 100%.
 
*# ask MCC to degauss and turn the tagger dipole off; while the magnet is being degaussed call the beamline expert (S. Stepanyan) to inform him, you are starting the procedure to send the beam to the Faraday Cup;
 
*# ask MCC to degauss and turn the tagger dipole off; while the magnet is being degaussed call the beamline expert (S. Stepanyan) to inform him, you are starting the procedure to send the beam to the Faraday Cup;
Line 139: Line 142:
 
*# repeat harp scans at 2C21, 2C24 (tagger harp) and 2H01: the profile for 2H01 should be as in https://logbooks.jlab.org/entry/3507626. Make sure you select the proper PMT for the analysis. The profile at 2C21 and 2C24 should be as in the scans performed with beam to the tagger magnet yoke dump. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan.  
 
*# repeat harp scans at 2C21, 2C24 (tagger harp) and 2H01: the profile for 2H01 should be as in https://logbooks.jlab.org/entry/3507626. Make sure you select the proper PMT for the analysis. The profile at 2C21 and 2C24 should be as in the scans performed with beam to the tagger magnet yoke dump. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan.  
  
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
+
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF
 
 
<!--
 
# For every daq crash login into clondaq3 as a clasrun then run the following command
 
#* clasrun@clondaq3:clasrun> <font color='blue'> save_DAQ_logs.pl</font> (See [https://logbooks.jlab.org/files/2016/04/3397123/DAQ_DPM_Crash_0.png])
 
# [https://clonwiki0.jlab.org/wiki/index.php/DAQ/Online_Quick_Reference Reboot DAQ completely].
 
# If the procedure fails to restore DAQ, call Sergey (DAQ on call) without any further disturbing the DAQ status.
 
 
 
=== Locking up the hall  ===
 
* Work with the hall work coordinator (Doug Tilles or his designee) to make sure hall is ready for sweep at around 3pm:
 
** Vacuum is good, magnet power supplies (Tagger and Torus) are turned ON and in remote mode, LCW is on.
 
* Make sure experts, beamline, ECal, DC, HTCC, FTOF, and slow controls, checked their systems before the lockup.
 
* When ready notify MCC to start sweep and lockup of the hall.
 
* Make sure all necessary monitoring GUIs are up and running.
 
* Make sure beam viewer screens are up.
 
* When hall is in "Beam Permit"
 
**  Ramp torus to 10% of max current (380A)
 
** Turn tagger magnet ON if beam tune on the tagger dump or tagger yoke dump will be needed (it will be needed if beam comes back after several hours of down)
 
** Turn all beamline devices ON, turn all CLAS12 detectors OFF  
 
 
-->
 
-->
<!-- ===Establishing Acceptable Beam Conditions:===
 
# <font color='red'>'''Make sure CLAS12 is OFF When Beam is Turned For the First Time After long Down.'''</font>
 
# <b>First send beam to the tagger yoke dump:</b>
 
#* Check that beam type is set to "Photon" (<tt>HPS_EPICS->Beam->BTA</tt>).
 
#* Ask MCC to turn ON the tagger magnet and then deliver <10 nA beam.
 
#* Follow instructions under "Procedures" on the documentation tab for [[Media:CLAS12_beamline_commissioning.pdf|Beamline Commissioning Plans]]. To tune the beam on tagger yoke dump and perform harp scans, beam current should be <10 nA.
 
#* Check profile using 2C21 and tagger harp scans, and compare the positions and widths with previous scans ([https://logbooks.jlab.org/entry/3388429],[https://logbooks.jlab.org/entry/3388441])
 
#** Positions on both harps should be within 1mm
 
#** Width on 2C21 should be <~0.1+/-0.05 mm
 
#** Width on tagger harp (2C24) <~0.5 +/- 0.1mm-->
 
<!--#* Halo counters UPS-L/R and TAG-L/T/T2 should be ~few Hz/nA [https://logbooks.jlab.org/entry/3376736]-->
 
<!-- # <b> While MCC degausses the tagger magnet, verify that chicane is ON</b>
 
#* If not, turn it on.  Strictly follow the procedure in the beam line manual!-->
 
<!--# ''' Send beam to the Faraday cup '''
 
#* If the beam optics is correct, then you should immediately see the beam spot on the Downstream Viewer
 
#* If you don't see it immediately, and rates on halo counters are more than 100 Khz, then ask MCC, to change to pulsed (tune mode) beam, and ask to put corrector values. At this point don't accept any CW beam, until beam spot is visible on Downstream Viewer.
 
#* If MCC operator is not able to tune the beam more than 30 minutes, then please notify RC
 
#* Tune beam profile at CLAS12 target using 2H01A harp. The required beam profile at 2H01A harp is: X-width <~0.3 mm, Y-width <~ 0.3 mm
 
#* Check and log the beam spot on chromax viewer
 
#* Check rates on halo counters
 
#*# UPS-L and UPS-R few Hz/nA,
 
#*# The tagger counters should count less than Hz/nA and downstream counters should count ~Hz/nA,
 
#*# Midstream counters few Hz/nA
 
#* Once all the above is achieved, turn first CLAS12 ECal HV '''ON''' and monitor and log ECal rates before bringing rest of the detector UP-->
 
  
<!-- === Setting up the FSD threshold ===
+
| valign=top |
*When you are about to calculate FSD limit, it means the beam is already established, and the target is in.
 
* To calculate the FSD threshold run the folloing executable
 
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
 
* Note we use 1 ms integration time, and want 5.5 sigma away from the average rates
 
* Allowed tolerable rate increase default is 15%, if that causes many trips, then contact RC, he might suggest to increase that number
 
* <font color='red'> Make sure if MCC operator set the FSD limit and integration time correctly </font>
 
-->
 
  
 +
==<font color=blue>''' General Instructions''':</font>==
  
|-
+
* For a given beam current, compute the FSD thresholds according to the [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf Establish Physics Quality Beam] document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
!align=left width=50% style="background:#eeeeee;"|
+
* The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
 +
* Do not run more than 60 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
 +
* Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
 +
* In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
 +
* With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
 +
* All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed.
 +
* Check that no unecessary beamline-related screens are open.  This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens.
  
 
==Every Shift:==
 
==Every Shift:==
Line 206: Line 167:
 
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 
#* Fill and submit the [https://logbooks.jlab.org/checklists/151 shift checklist in the logbook]
 
# Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF.
 
# Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF.
 
| valign=top style="background:#eeeeee;"|
 
  
 
==Every Run:==
 
==Every Run:==
Line 217: Line 176:
  
 
|}
 
|}
 
= Long Term Schedule =
 
<!--#######################################  LONG TERM  #################################################-->
 
  
 
= Monitoring =
 
= Monitoring =
Line 226: Line 182:
 
| valign=top |
 
| valign=top |
 
===Webcams===
 
===Webcams===
* [http://cctv6.jlab.org Faraday Cup Beam Viewer]
+
* [http://hallbcam07.jlab.org Faraday Cup Beam Viewer]
 
* [http://cctv1.jlab.org Tagger Beam Dump Viewer]
 
* [http://cctv1.jlab.org Tagger Beam Dump Viewer]
 
* [http://cctv12.jlab.org CND CAMAC Crate]
 
* [http://cctv12.jlab.org CND CAMAC Crate]
Line 250: Line 206:
 
===Hall-B===
 
===Hall-B===
 
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures]
 
* [https://clasweb.jlab.org/wiki/index.php/CLAS12_OPS_Doc Operation Safety Procedures]
* [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Offline Analysis Wiki]
+
* [https://wiki.jlab.org/clas12-run/index.php/Run_Group_A Run Group A Wiki]
 +
* [https://clasweb.jlab.org/wiki/index.php/Run_Group_A Run Group A Analysis Wiki]
 +
* [https://clasweb.jlab.org/wiki/index.php/Engineering_Run_Analysis Engineering Run Analysis Wiki]
 
* [http://clasweb.jlab.org/rcdb RCDB]
 
* [http://clasweb.jlab.org/rcdb RCDB]
 
| valign=top |
 
| valign=top |
Line 257: Line 215:
 
* [http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php Program Deputy Shift Plans]
 
* [http://opweb.acc.jlab.org/CSUEApps/bta03/pd_shiftplan_history.php Program Deputy Shift Plans]
 
* [http://opweb.acc.jlab.org/internal/ops/ops_webpage/run_coord/runcoord_form.php?action=main Run Coordinator Reports]
 
* [http://opweb.acc.jlab.org/internal/ops/ops_webpage/run_coord/runcoord_form.php?action=main Run Coordinator Reports]
 +
| valign=top |
 +
===Bluejean meetings===
 +
* [https://bluejeans.com/502085879 Daily analysis meeting] 502085879
 +
* [https://bluejeans.com/502085879 Daily Run meeting] 502085879
 +
* [https://bluejeans.com/7572697303 RGA Wed meeting] 7572697303
 
|}
 
|}
  

Latest revision as of 13:45, 25 July 2024

[edit]
Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.


CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)

RC: Silvia Niccolai

  • (757) 575-7540
  • 9 575 7540 from Counting Room
  • silvia@jlab.org

PDL: Maurizio Ungaro

  • (757) 876-1789
  • 9 876-1789 from Counting Room
  • ungaro@jlab.org


  • Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
  • Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
  • Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)
  • Note 4: With beam to the Faraday Cup, typical rates pn all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.

Run Plan:

(last update 2/4 - 14:30)

All studies will take data at 100% torus field (negatives inbending) and 100% solenoid field (positive polarity on supply). The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [1]), integration time is set to 5 ms, and that the orbit locks are on.

  • Take 2 hour data runs with PROD/elec_htcc_1phe_pcal_300.trg at 30 nA with the following DC HV and thresholds:
    • R1: #9/-45 mV, R2: #10/-65 mV, R3: #10/-60 mV
    • R1: #8/-30 mV, R2: #10/-65 mV, R3: #9/-45 mV
    • R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV
  • Take data at 35 nA with PROD/elec_htcc_1phe_pcal_300.trg until morning; runs should be 2 hrs in length. Use R1: #8/-30 mV, R2: #9/-45 mV, R3: #9/-45 mV
  • Hall B work for Monday:
    • Ramp down solenoid (torus can stay up) (RC)
    • Empty the hydrogen target (Hall B Engineering)
    • Complete shielding addition outside scattering chamber (Hall B Engineering)
    • Restore beamline (Hall B Engineering)
    • Replace FT-Hode mezzanine board (N. Zachar)
    • Work on DC cable swaps (M. Cook + M. Mestayer)
    • Work on vacuum gauge (D. Anderson)
    • Investigate polarity of busy signal (S. Boyarinov)
    • Setup gated/ungated scalers and clock scalers (S. Boyarinov)
    • SAF111 walkthrough (E. Pasyuk)
    • Pass change (5-pass to 3-pass)


General Instructions:

  • For a given beam current, compute the FSD thresholds according to the Establish Physics Quality Beam document. Call MCC to update the values. Contact the beamline expert if there are questions about setting the FSD thresholds.
  • The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during an access, they should be switched off when leaving the Hall. Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cooldown.
  • Do not run more than 60 minutes above 30 nA with 5-pass beam without the beam blocker in front of Faraday cup. Put beam blocker in for long running at high currents for 5 pass operations.
  • Turn DC HV off only for beam tuning; if no beam is available or when beam is stable, keep them on even if you are not taking data.
  • In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218
  • With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem.
  • All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed.
  • Check that no unecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and ioc health screens.

Every Shift:

  1. Follow run plan as outlined by RC
  2. If any concern about beam stability, ask MCC if orbit locks are on (they should be).
  3. Keep shift summary up to date in HBLOG. Record all that happens.
    • Check on white board all scalers, strip charts and monitoring plots that need to be logged regularly
    • Document any beam condition change and send scaler GUIs to HBLOG
    • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side.
    • Fill and submit the shift checklist in the logbook
  4. Perform 2H01A harp scan once per shift or when beam conditions have changed, based on beam monitors (BPMs, halo rates, beam-viewer). During harp scans the HV for DC and HTCC should be OFF.

Every Run:

  1. Log screenshots of:
    • main scaler GUI display
    • Detector occupancy plots
    • Trigger rate gui
    • Beam strip charts


Clas12design.png