Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 85: | Line 85: | ||
* Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | * Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | ||
− | * Note 3: Nominal beam positions: ''' | + | * Note 3: Nominal beam positions: '''2H01 (X=0.7 mm, Y=-2.0 mm)''' |
* Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls. | * Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls. | ||
Line 120: | Line 120: | ||
− | <font color=blue>''' | + | <font color=blue>''' February 15 Day and Swing '''</font> |
− | * | + | * Continue data taking production data at 25 nA with full hydrogen target, 2hours/run |
− | * | + | * The machine will take the beam away for 4 hours to reload and test pervious setting of the machine at some of the corners with the hope to reduce the couplings. |
− | * | + | * Once this work is completed, the injector group will perform a Mott polarization measurement |
− | * | + | * One hour before the beam is back we will prepare to receive beam to tagger yoke following the procedure outlined in section 1 in Establishing Physics-Quality Beam document |
− | * | + | * Once beam beam quality established at the tagger we proceed with Moller run measurements of the polarization at the 2 half wave plates in and out |
+ | * Once the measurement of the polarization is completed we proceed with beam tuning to the FC following the procedure outlined in section2 in Establishing-Quality Beam document | ||
+ | * Once beam quality established to the FC we ask MCC for beam current of 10 nA making sure that experiment monitoring/rates good | ||
+ | * Resume data taking with full target beam current 30 nA | ||
+ | * During the down time Yuri will take a controlled access to the Hall to check on the SVT cooling system | ||
+ | * in case of questions or uncertainty of what to do please call the RC | ||
Revision as of 09:06, 15 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=0.7 mm, Y=-2.0 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/14- 16:30)
February 15 Day and Swing
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B |
Accelerator |
Bluejean meetings
|