*When beam is available, notify beamline expert and run coordinator. Then check beam profile by performing harp scans. Call PDL to ramp up solenoid and torus to 100%, with negative inbending.
+
*When beam is available, notify beamline expert and run coordinator. Follow instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to get an acceptable beam profile. Call PDL to ramp up solenoid and torus to 100%, with negative inbending.
*Once the beam profile is satisfying, call beamline expert to perform Moller run.
+
*Once the beam profile is satisfying, call beamline expert to perform Moller run.  
 
*After the Moller run, turn off HVs of all detectors. Then send beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font>
 
*After the Moller run, turn off HVs of all detectors. Then send beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font>
 
*Once the beam is going to the Faraday cup, call MCC to stop the beam and fill the target.
 
*Once the beam is going to the Faraday cup, call MCC to stop the beam and fill the target.