Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 111: | Line 111: | ||
'''</font> | '''</font> | ||
− | *When beam is available, notify beamline expert and run coordinator. | + | *When beam is available, notify beamline expert and run coordinator. Follow instructions in the "Establish-physics quality beam" procedure at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to get an acceptable beam profile. Call PDL to ramp up solenoid and torus to 100%, with negative inbending. |
− | *Once the beam profile is satisfying, call beamline expert to perform Moller run. | + | *Once the beam profile is satisfying, call beamline expert to perform Moller run. |
*After the Moller run, turn off HVs of all detectors. Then send beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font> | *After the Moller run, turn off HVs of all detectors. Then send beam to the Faraday Cup with empty target. <font color=red> Make sure Upstream, Midstream, Downstream, BOM and Solenoid FSDs are Unmasked with appropriate thresholds. </font> | ||
*Once the beam is going to the Faraday cup, call MCC to stop the beam and fill the target. | *Once the beam is going to the Faraday cup, call MCC to stop the beam and fill the target. |