Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 120: | Line 120: | ||
--> | --> | ||
− | == '''Run Plan for Friday April 6 | + | == '''Run Plan for Friday April 6 Swing shift:''' == |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | * Take production data with empty target with Trigger: trigger_v12.trg and beam current of 150nA | ||
+ | * 2.5 Hours each run | ||
+ | == '''Run Plan for Friday April 7 owl shifts:''' == | ||
+ | * Switch to production with full target | ||
+ | * Ask for beam off | ||
+ | * Fill the target according to the procedure in the target manual | ||
+ | * Set the FSD thresholds (1000, 1000, 650000, 15000 repectively on Upstream, Midstream and BOM | ||
+ | * Once the target is full ask for 5 nA verify that the rates on all the detctors are Ok and that the beam is stable | ||
+ | * Establish maximum beam current with lifetime above 90% | ||
+ | * Set the New FSD threshold and continue start data taking 3 hours/run | ||
Revision as of 19:25, 6 April 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Spring 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 4/06- 1:20 AM)
Run Plan for Friday April 6 Swing shift:
Run Plan for Friday April 7 owl shifts:
In case of other questions or uncertainties of what to do, please call the RC
|