Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 93: | Line 93: | ||
* Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls. | * Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls. | ||
− | * Note 5: In case of the Torus and/or Solenoid Fast Dump do the following: | + | * <font color=red> '''Note 5: In case of the Torus and/or Solenoid Fast Dump do the following: |
*# Notify MCC, request beam OFF and drop Hall status to Power Permit | *# Notify MCC, request beam OFF and drop Hall status to Power Permit | ||
*# Call Engineering on-call | *# Call Engineering on-call | ||
*# Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" filed add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org | *# Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" filed add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org | ||
*# Notify Run Coordinator | *# Notify Run Coordinator | ||
+ | *# Call the MM expert to turn the detector off | ||
+ | *# Call SVT expert to turn SVT off | ||
+ | *# Turn off all the other detectors'''</font> | ||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 108: | Line 111: | ||
*<font color=red> '''When beam is being delivered to the Faraday Cup the Fast Shut Down: Upstream, Midstream, Downstream, BOM and Solenoid should be always Unmasked ''' | *<font color=red> '''When beam is being delivered to the Faraday Cup the Fast Shut Down: Upstream, Midstream, Downstream, BOM and Solenoid should be always Unmasked ''' | ||
*''' No chnages to the FSD threshold without RC or beamline expert approval''' | *''' No chnages to the FSD threshold without RC or beamline expert approval''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Line 136: | Line 132: | ||
− | == '''Run Plan for | + | == '''Run Plan for Wednesday April 11 Day shift''' == |
− | * | + | * Continue data taking for production with with trigger_v12.trg @ 45nA 3 hours/run, make sure that the trigger rates are as expected. |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
Revision as of 09:38, 11 April 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Spring 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=1.0 mm, Y=-1.5 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
- Note 5: In case of the Torus and/or Solenoid Fast Dump do the following:
- Notify MCC, request beam OFF and drop Hall status to Power Permit
- Call Engineering on-call
- Make separate log entry with copies to HBTORUS and HBSOLENOID logbooks. In the "Notify" filed add Ruben Fair, Probir Goshal, Dave Kashy and esr-users@jlab.org
- Notify Run Coordinator
- Call the MM expert to turn the detector off
- Call SVT expert to turn SVT off
- Turn off all the other detectors
Run Plan:(last update 4/10 - 8:30)
Run Plan for Wednesday April 11 Day shift
In case of other questions or uncertainties of what to do, please call the RC
|
General Instructions:
Every Shift:
Every Run: Log screenshots of:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|