Difference between revisions of "KPP Run"
Jump to navigation
Jump to search
Line 93: | Line 93: | ||
# Study tracking efficiency: four HV setings: 8, 9, 10, 11, 12, for each HV four threshold settings: 30, 45, 60, 75. 10 min runs each. | # Study tracking efficiency: four HV setings: 8, 9, 10, 11, 12, for each HV four threshold settings: 30, 45, 60, 75. 10 min runs each. | ||
# Continue with data taking torus at -1900 A, target at 13.125, DC HV seting #11, thresholds 45 mV | # Continue with data taking torus at -1900 A, target at 13.125, DC HV seting #11, thresholds 45 mV | ||
− | # Switch target (call RC) continue data taking | + | # Switch target (call RC) and continue data taking till Sunday morning |
+ | # Change torus polarity, setting +1900 A. While torus current is changing, perform harp scans and FSD studies (see below) | ||
# (Sunday) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): | # (Sunday) Perform beam studies (call RC and beamline, <b> Turn off DC HV </b>): | ||
#*<del>Do harp scans - 2C21, "tagger", and 2H01</del> done while changing the torus setting | #*<del>Do harp scans - 2C21, "tagger", and 2H01</del> done while changing the torus setting | ||
#*<del>Run 2H01 at low speed (speed=0.1) to 13.3 position and save strip chart of motor position together with downstream halo counters</del> done while changing the torus setting, the first carbon target was found at ~10.6 | #*<del>Run 2H01 at low speed (speed=0.1) to 13.3 position and save strip chart of motor position together with downstream halo counters</del> done while changing the torus setting, the first carbon target was found at ~10.6 | ||
#*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rateson halo counters. | #*Test FSD system, run Struck scaler with 300um dwel time, ask MCC to set FSD trip time integration times for FSD channels (1 old and 3 new) to 1 ms. Un-mask one FSD channel, run collimator with slmall steps to left or right untill it will intercept beam tails. It will raise rateson halo counters. | ||
− | # Continue data taking | + | # Continue data taking at 1900 A, trigger Sector-2 only high threshold |
− | # | + | # Switch to 6-sector trigger, take data till Monday morning. |
+ | # <b> Run ends 7 am on Monday</b> | ||
<!-- | <!-- | ||
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == | == The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == |