Line 104: | Line 104: | ||
# <del>Take one 30 min run with torus at zero </del> done | # <del>Take one 30 min run with torus at zero </del> done | ||
# Set torus +1900 A, continue data taking, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts) | # Set torus +1900 A, continue data taking, trigger Sector-2 only, high threshold in EC-in (5000 fADC counts) | ||
− | # | + | #* take one run for 2 hours at low luminosity. Move beam in vertical direction up (or down does not matter) with 0.1 mm steps untill rates on downstream counters will be ~5kHz |
# <del> Take short ~1 hour, random trigger data (Sergei should be in to set it up). Should happen before goimg to 6-sector trigger ~9 pm </del> | # <del> Take short ~1 hour, random trigger data (Sergei should be in to set it up). Should happen before goimg to 6-sector trigger ~9 pm </del> | ||
− | # Switch to 6-sector trigger (some time ~ | + | # Switch to 6-sector trigger (some time ~11pm), take data till Monday morning. |
− | # <b> Run ends 7 am on Monday</b> | + | # <b> Run ends 7 am on Monday. Ramp torus down to zero, and turn PS OFF. Ask MCC to terminate the beam and take the Hall to restricted aceess. Turn OFF all HV's.</b> |
<!-- | <!-- | ||
== The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == | == The Hall was closed and brought to controlled access at 8pm on Thursday, February 2 == |
Revision as of 15:54, 5 February 2017
[edit]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 KPP run, February 3 to March 3
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
Run Plan for February 4-5, 2017 :
Plan:
Important Notes:
|
General Instructions:Locking up the hall
Establishing Acceptable Beam Conditions:
Setting up the FSD threshold
hpsrun@clonpc11> /home/hpsrun/scripts/FSD/Calc_FSD_Threshold.exe
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|