Difference between revisions of "Run Group M"
Jump to navigation
Jump to search
Line 276: | Line 276: | ||
=== Overview === | === Overview === | ||
* Bluejeans for 24-7 communication with counting house: https://bluejeans.com/950041022 | * Bluejeans for 24-7 communication with counting house: https://bluejeans.com/950041022 | ||
− | |||
* Remote VNC connection instructions: https://logbooks.jlab.org/entry/3906039 | * Remote VNC connection instructions: https://logbooks.jlab.org/entry/3906039 | ||
** All necessary applications should be avaible from the desktop menu (left/right click on the desktop) | ** All necessary applications should be avaible from the desktop menu (left/right click on the desktop) | ||
Line 284: | Line 283: | ||
=== Tasks === | === Tasks === | ||
* Fill the [https://logbooks.jlab.org/checklists/151 shift checklist]? | * Fill the [https://logbooks.jlab.org/checklists/151 shift checklist]? | ||
+ | * Remind the expert in the counting house to close and restart their bluejeans once per shift | ||
* Upload plots/screenshots to the [https://logbooks.jlab.org/book/hallb Hall B logbook] once per run | * Upload plots/screenshots to the [https://logbooks.jlab.org/book/hallb Hall B logbook] once per run | ||
** Beamline overview screen | ** Beamline overview screen |
Revision as of 18:03, 8 November 2021
[edit]
Shift ScheduleESAD, COO, RSAD Read before shift!!!Shift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[10 digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!
RC: Stepan Stepanyan
- (757) 575-7540
- 9 575 7540 from Counting Room
- stepanya@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Nov 10 - 11 2021
Other Important Information
Shift Worker Notes:In case of other questions or uncertainties of what to do, call the RC or PDL |
General Instructions:Every Shift:
Every Run: Log screenshots of: (this is for the remote shifter, see dedicated tab above.)
|
Overview
Tasks
|
Shift Worker Backup Table
|
Hall-B
Run lists |
Accelerator |
Bluejean meetings
|