− | * | + | == <font color=blue>''' References and Standards:'''</font>== |
+ | ''(last update 01/18/2022- 23:30 | ||
+ | |||
+ | <b> Nominal Beam Positions </b> | ||
+ | *2H01, X: -0.8 mm, Y: 0.4 mm | ||
+ | *2C24, X: -2.0 mm, Y: +0.6 mm | ||
+ | |||
+ | <b> FSD Thresholds </b> | ||
+ | * Upstream: 2000 Hz | ||
+ | * Midstream: 2000 Hz | ||
+ | * Downstream: 500000 Hz | ||
+ | * BOM: 10000 | ||
+ | * 5 ms dwell time | ||
+ | |||
+ | <b> Reference Harp Scans for Beam on Faraday Cup: </b> 2H01 [https://logbooks.jlab.org/entry/3963256] | ||
+ | |||
+ | <b> Reference Harp Scans for Beam on Tagger dump: </b> 2C21 [https://logbooks.jlab.org/entry/3963244], tagger harp [https://logbooks.jlab.org/entry/3963250] | ||
+ | |||
+ | <b> Reference Monitoring Histograms (6 nA, production C) </b> [https://logbooks.jlab.org/entry/3973807] | ||
+ | <b> Old reference Monitoring Histograms (50 nA, production LD2) </b> [https://logbooks.jlab.org/entry/3943458] | ||
+ | |||
+ | <b> Counter rates </b> | ||
+ | * Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA. | ||
+ | * Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA. | ||
+ | * Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls. | ||
+ | |||
+ | <b> Beamline vacuum: </b> should be not higher than 5e-5. | ||
+ | |||
+ | |} | ||
+ | |||
+ | = Notes/Known Issues = | ||
+ | <!--####################################### Notes/Known Issues ################################################--> | ||
+ | {| {{TableStyle1}} | ||
+ | |||
+ | | valign=top | | ||
+ | |||
+ | == <font color=blue> Notes </font> == | ||
+ | |||
+ | * The main lights in the Hall (dome lights) and the Forward Carriage lights are being kept off because of light leaks affecting some of the detectors. If these lights are switched on during access, they should be switched off when leaving the Hall. <b> Refer to these photos!</b> | ||
+ | ** ON: [https://logbooks.jlab.org/entry/3825712] | ||
+ | ** OFF: [https://logbooks.jlab.org/entry/3825731] | ||
+ | ** Note that the dome lights when switched off cannot be turned back on immediately because they require 10-15 min to cool down. | ||
+ | |||
* Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels. | * Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels. | ||
The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls. | The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls. | ||
Line 148: | Line 188: | ||
* Note 2: At the end of each run, follow the standard DAQ restart sequence | * Note 2: At the end of each run, follow the standard DAQ restart sequence | ||
"end run", "cancel", "reset", then if the run ended correctly, "download", "prestart", "iocjscalerRestartAll.sh", "go". If the run did not end correctly or if any ROCs had to be rebooted, "configure", "download", "prestart", "iocjscalerRestartAll.sh", "go". | "end run", "cancel", "reset", then if the run ended correctly, "download", "prestart", "iocjscalerRestartAll.sh", "go". If the run did not end correctly or if any ROCs had to be rebooted, "configure", "download", "prestart", "iocjscalerRestartAll.sh", "go". | ||
− | |||
After each step, make sure it is complete in the Run Control message window. If a ROC has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | After each step, make sure it is complete in the Run Control message window. If a ROC has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. | ||
--> | --> | ||
Line 183: | Line 222: | ||
*Note 14: The error messages " ERR: Event ..." for crates tdcband1, tdcecal1 and tdcecal6 are NOT a problem | *Note 14: The error messages " ERR: Event ..." for crates tdcband1, tdcecal1 and tdcecal6 are NOT a problem | ||
+ | |||
+ | * Do not run more than 30 minutes with >150 W beam to Faraday cup without the beam blocker. | ||
+ | * Turn DC HV off only for beam tuning; if no beam is available or when the beam is stable, keep them on even if you are not taking data. | ||
<!-- | <!-- | ||
*Note 11: Shift workers must check the occupancies! Use this tool to compare to previous runs: [https://clas12mon.jlab.org/mon12/histograms/ https://clas12mon.jlab.org/mon12/histograms/] | *Note 11: Shift workers must check the occupancies! Use this tool to compare to previous runs: [https://clas12mon.jlab.org/mon12/histograms/ https://clas12mon.jlab.org/mon12/histograms/] | ||
− | |||
--> | --> | ||
+ | | valign=top | | ||
− | == <font color=blue> | + | == <font color=blue> Known Issues </font> == |
− | |||
− | + | * If any weird stripes appear in the DC occupancy plots, call Sergey. This is a known problem. | |
− | * | ||
− | |||
− | + | * In case of loss of communication with IOCBTARG, follow instructions at https://logbooks.jlab.org/entry/3502218 | |
− | * | + | ** Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and IOC health screens. |
− | |||
− | * | ||
− | * | ||
− | |||
− | < | + | <!-- * With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. |
+ | * All jscaler iocs (iocjscalerX) on the health screen (under DAQ tab) must be restarted after every DAQ prestart is completed. Follow this link for detailed instructions https://userweb.jlab.org/~baltzell/CLAS12/SC/jlabScalersOps.txt | ||
+ | --> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
+ | |} | ||
+ | = Shift Expert = | ||
+ | <!--####################################### Shift Expert ################################################--> | ||
+ | {| {{TableStyle1}} | ||
| valign=top | | | valign=top | | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
'''Every Shift:''' | '''Every Shift:''' | ||
* Follow the run plan as outlined by RC | * Follow the run plan as outlined by RC | ||
Line 252: | Line 270: | ||
'''In case of other questions or uncertainties of what to do, call the RC or PDL''' | '''In case of other questions or uncertainties of what to do, call the RC or PDL''' | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
|} | |} | ||
Line 378: | Line 344: | ||
|} | |} | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | = Monitoring = | ||
+ | <!--####################################### MONITORING ################################################--> | ||
+ | {| {{TableStyle1}} | ||
+ | | valign=top | | ||
+ | ===Webcams=== | ||
+ | * [http://cctv1.jlab.org Tagger Beam Dump Viewer] | ||
+ | * [http://cctv12.jlab.org CND/CTOF Ammeter] | ||
+ | * [http://cctv7.jlab.org FTOF/ECAL Ammeter] | ||
+ | * [http://hallbcam02.jlab.org Hall Fisheye] | ||
+ | * [http://cctv11.jlab.org Saclay Cryotarget] | ||
+ | * Faraday Cup Beam Viewer | ||
+ | ** To reboot it, run <tt>beam-viewer-reboot</tt> on a clonpc. | ||
+ | |||
+ | | valign=top | | ||
+ | ===Manuals=== | ||
+ | *[https://wiki.jlab.org/clas12-run/images/c/c9/CedManual.pdf CED Manual] | ||
+ | *[https://wiki.jlab.org/clas12-run/images/f/fd/CLAS12Mon_documentation.pdf MON12 Manual] | ||
+ | *[https://wiki.jlab.org/clas12-run/images/a/ae/Online_shifts.pdf off-line Manual] | ||
+ | |||
+ | | valign=top | | ||
+ | ===Hall Webcams=== | ||
+ | * [https://hallach-cam.jlab.org/axis-cgi/mjpg/video.cgi?date=1&clock=1 Hall A] | ||
+ | * [https://hallbch-cam.jlab.org/axis-cgi/mjpg/video.cgi?date=1&clock=1 Hall B] | ||
+ | * [https://hallcch-cam.jlab.org/axis-cgi/mjpg/video.cgi?date=1&clock=1 Hall C] | ||
+ | * [https://halldch-cam.jlab.org/axis-cgi/mjpg/video.cgi?date=1&clock=1 Hall D] | ||
+ | |||
+ | | valign=top | | ||
+ | ===Epics on the web=== | ||
+ | * [https://hallbopi.jlab.org/webopi3.3/w Hall B WebOPI] (CUE Login) | ||
+ | * [https://epicsweb.jlab.org Accelerator] (CUE Login) | ||
+ | |||
+ | |||
+ | | valign=top | | ||
+ | ===Live Monitoring Links=== | ||
+ | *[https://clas12mon.jlab.org/rgm/pass0_online_qa/tlsummary/ CLAS12 Monitoring Timelines] | ||
+ | *[https://clasweb.jlab.org/clas12online/timelines/rg-m/RGM2022_progress_charge.html Live Charge Collected Plots] | ||
+ | *[https://clasweb.jlab.org/clas12online/timelines/rg-m/RGM2022_progress.html Live Luminosity Collected Plots] | ||
+ | |||
+ | |||
+ | |} | ||
+ | |||
+ | |||
+ | |||
+ | {| {{TableStyle1}} | ||
+ | | valign=center | | ||
+ | [[File:RGM_monitoring_dec_21_charge.png|1100px]] | ||
+ | |||
+ | |||
+ | |} | ||
+ | |||
+ | |||
= Useful Links = | = Useful Links = |
Revision as of 21:35, 26 January 2022
- Shift Documentation
- Phone Numbers
- Short Term Schedule
- Notes/Known Issues
- Shift Expert
- Remote Shifts
- Monitoring
- Useful Links
Shift ScheduleESAD, COO, RSADShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[ten digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
Important: Document all your work in the logbook!
RC: Susan Schadmand (phone below) and Sebastian Kuhn (kuhn@jlab.org, 757-639-6640)
- (757) 575-7540
- 9 575 7540 from Counting Room
- susansch@jlab.org
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Run Plan: Jan 26 - Jan 30 2022
Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg .
Run duration 100M events or 4 hours, whichever comes first.
- Get Beam (pass2, 4 GeV beam)
- harp scans
- target centering
- if BEFORE 9pm:
- fill Ar target
- luminosity scan - increase downstream halo FSD threshold, if needed
- beam blocker calibration (during day)
- run for 2 days
- if AFTER 9pm:
- insert C target
- decide 80 or 90 nA
- beam blocker calibration
- run 12 hours
- switch to Ar (2 days)
- switch back to C
- Sunday switch to LH2
- take C data while purging ?
- 1 shift LH2
- beam blocker calibration
- 4 hours empty target
- Monday pass change (6GeV beam)
DAQ configuration PROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg . At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE
References and Standards:(last update 01/18/2022- 23:30 Nominal Beam Positions
FSD Thresholds
Reference Harp Scans for Beam on Faraday Cup: 2H01 [1] Reference Harp Scans for Beam on Tagger dump: 2C21 [2], tagger harp [3] Reference Monitoring Histograms (6 nA, production C) [4] Old reference Monitoring Histograms (50 nA, production LD2) [5] Counter rates
Beamline vacuum: should be not higher than 5e-5. |
Notes
The integrated rates on the upstream counters have to be in the range 0-15 Hz (rates up to 100 Hz are acceptable) and the rates on the midstream counters have to be in the range 10-20 Hz (acceptable up to 50 Hz) @50 nA. Counting rates in the range of hundreds of Hz may indicate a bad beam tune or bleed-through from other Halls.
|
Known Issues
|
Log screenshots of: (this is for the remote shifter, see dedicated Remote Shifts tab above.)
In case of other questions or uncertainties of what to do, call the RC or PDL |
Overview
Tasks
|
|
Webcams
|
Manuals |
Hall Webcams |
Epics on the web
|
Live Monitoring Links
|
|
Hall-B
Run lists |
AcceleratorReferences |
ZOOM meetings
|