Difference between revisions of "Run Group M"
Line 206: | Line 206: | ||
== <font color=blue> Known Issues </font> == | == <font color=blue> Known Issues </font> == | ||
+ | |||
+ | * '''DAQ'''The error messages " ERR: event# ..." for crates tdcband1, tdcecal1 and tdcecal6 are NOT a problem | ||
+ | |||
* '''PCAL''' transient: mu strip occupancy hole in U view TDC, https://logbooks.jlab.org/entry/3978499, https://logbooks.jlab.org/entry/3978736 | * '''PCAL''' transient: mu strip occupancy hole in U view TDC, https://logbooks.jlab.org/entry/3978499, https://logbooks.jlab.org/entry/3978736 | ||
Line 216: | Line 219: | ||
* '''RICH''' noisy pixels normal, https://logbooks.jlab.org/entry/3972462 . There is a current new issue seen in the occupancy spectrum, https://logbooks.jlab.org/entry/3978583 | * '''RICH''' noisy pixels normal, https://logbooks.jlab.org/entry/3972462 . There is a current new issue seen in the occupancy spectrum, https://logbooks.jlab.org/entry/3978583 | ||
− | * | + | * '''IOCBTARG''' In case of loss of communication, follow instructions at https://logbooks.jlab.org/entry/3502218 |
** Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and IOC health screens. | ** Check that no unnecessary beamline-related screens are open. This includes particularly the big beamline overview screen, but also and any motor/harp/collimator screens, and IOC health screens. | ||
− | |||
<!-- * With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. | <!-- * With any issue contact On-Call Experts or RC - do not spend more than 15-20 min trying to fix the problem. |
Revision as of 12:14, 30 January 2022
- Shift Documentation
- Phone Numbers
- Short Term Schedule
- Notes/Known Issues
- Shift Expert
- Remote Worker Shift
- Monitoring
- Useful Links
Shift ScheduleESAD, COO, RSADShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
If calling local numbers (with area code prefix 757) from the counting room dial 9+[last 7 digits]. To call other area codes dial 91+[ten digit number]
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
CLAS12 Run Group M, Fall 2021
Beam energies: 2.1, 4.0, 6.0 GeV (1.96 GeV/pass)
RC: Sebastian Kuhn
- Sebastian Kuhn (757) 639-6640, kuhn@jlab.org
- 9 575 7540 from Counting Room
PDL: Valery Kubarovsky
- (757) 876-1789
- 9 876-1789 from Counting Room
- vpk@jlab.org
Jan 27 - 29, 2022
4GeV 22nA on LAr
Run Plan: Jan 29 - Jan 31, 2022
Production runs use PROD67_noVTPread and the trigger rgm_6GeV_inb_v1_0.trg .
Run duration 100M events or 4 hours, whichever comes first.
- LAr target is empty, cell stays in position
- Carbon target (single foil 2 mm) is IN
- Beam blocker IN
- FC calibration for C target is loaded
- Running with 90 nA
- Sunday Empty target run
- Put beam blocker IN
- FC calibration (4GeV) to be done
- Take 2-3 hours of empty target runs (100-150 nA)
- Monday pass change (6GeV beam)
- Need to establish quality beam, repeat beam centering, beam blocker calibration.
- OUTLOOK: Run on Ar, Sn and C with 6 GeV beam
DAQ configuration
PROD67_noVTPread , production trigger rgm_6GeV_inb_v1_0.trg .
At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE
- "end run", if the run ended correctly then: "prestart", "go"
- if the run did not end correctly or if any ROCs had to be rebooted:
- "cancel", "reset"
- "configure", "download", "prestart", "go"
- After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.
References and Standards
(last update 01/18/2022- 23:30)
Nominal Beam Positions
- 2H01, X: -0.6 mm, Y: 0.8 mm
- 2C24, X: -2.0 mm, Y: +0.6 mm
FSD Thresholds
- Upstream: 2000 Hz
- Midstream: 2000 Hz
- Downstream: 500000 Hz
- BOM: 10000
- 5 ms dwell time
Reference Harp Scans for Beam on Faraday Cup: 2H01 [1]
Reference Harp Scans for Beam on Tagger dump: 2C21 [2], tagger harp [3]
Reference Monitoring Histograms (6 nA, production C) [4] Old reference Monitoring Histograms (50 nA, production LD2) [5]
Counter rates
- Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
- Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
- Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.
Beamline vacuum: should be not higher than 5e-5.
Notes
|
Known Issues
|
(remote) shift worker: see dedicated Remote Shifts tab above. |
TasksEvery Run:
Every Shift:
Regularly:
|
|
Webcams
|
Manuals |
Hall Webcams |
Epics on the web
|
Live Monitoring Links
|
|
Hall-B
Run lists |
AcceleratorReferences |
ZOOM meetings
|