Difference between revisions of "Run Group C"

From clas12-run
Jump to navigation Jump to search
Line 37: Line 37:
 
| valign=top |
 
| valign=top |
 
===Procedures===
 
===Procedures===
* [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgc.pdf Physics-Quality Beam]
+
* [https://github.com/JeffersonLab/clas12-manuals/raw/master/beamline/manual/beam_estab_rgm.pdf Physics-Quality Beam]
 
* [[Media:moller.pdf|Performing Møller Runs]]
 
* [[Media:moller.pdf|Performing Møller Runs]]
 
* [[Media:HarpScanManual.pdf|Performing Harp Scans]]
 
* [[Media:HarpScanManual.pdf|Performing Harp Scans]]

Revision as of 12:24, 7 June 2022

[edit]
Role Phone Number
Hall B Run Coordinator (757) 575-7540 (cell)
Hall B Physics Division Liaison (757) 876-1789 (cell)
MCC 7048
Crew Chief 7045
Crew Chief (757) 876-3367 (cell)
Program Deputy (757) 876-7997 (cell)
RadCon (757) 876-1743 (cell)
Gate House Guard 5822
Location Phone Number
Hall B Floor 5165
Hall B Space Frame 5170 and 5171
Hall B Forward Carriage 5371
Hall B Gas Shed 7115
Hall B Counting House 5244 (Shift Expert)
Hall B Counting House (757) 329-4846 (Shift Expert cell)
Hall B Counting House 5245 or 5126 (Shift Worker)
Hall A Counting House 5501
Hall C Counting House 6000
Hall D Counting House 5504
Hall B System Phone Number On-Call Person
Engineering (757) 748-5048 (cell)
(757) 897-9060 (cell)
Engineering On-Call (primary)
Denny Insley (secondary)
Slow Controls (757) 748-6922 (cell) Nathan Baltzell
Beamline (757) 303-3996 (cell) Eugene Pasyuk
DC (757) 218-4372 (cell)
(757) 748-5048 (cell)
Florian Hauenstein (primary)
Engineering On-Call (secondary)
SVT/MVT/MM (757) 541-7539 (cell)
(757) 753-7769 (cell)
Yuri Gotra (primary)
Rafo Paremuzyan (secondary)
ECAL (757) 810-1489 (cell) Cole Smith
FTOF/CTOF/CND (757) 344-7204 (cell) Daniel Carman
ALERT (757) 329-4844 (cell) Raphael Dupré
HTCC/LTCC (757) 344-7174 (cell) Youri Sharabian
FT (757) 344-1848 (cell) Raffaella De Vita
BAND (757) 310-7198 (cell) Florian Hauenstein
RICH (757) 344-3235 (cell)
(757) 748-6922 (cell)
Christopher Dilks (primary)
Nathan Baltzell (secondary)
DAQ (757) 232-6221 (cell) Sergey Boiarinov
HYDRA (317) 550-9226 (cell) Torri Jeske
Authorized Hall B Solenoid/Torus Operators
Hall B Denny Insley, Morgan Cook, Eugene Pasyuk
Magnet Group Probir Ghosha, Renuka Rajput-Ghoshal
Detector Support Group Brian Eng, Pablo Campero, Tyler Lemon
DC Power Onish Kumar, Sarin Philip
  • Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
  • To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
  • Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.

Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.



CLAS12 Run Group C, Summer 2022

Daily RC Meetings at 14:00: CH Room 200C, and on Zoom

Zoom information: Link, Meeting ID: 160 867 4253, Passcode: 786506

RC: Sebastian Kuhn

  • 757 575-7540 or
  • 757 639-6640
  • Dial "9" before all numbers when calling from CH

PDL: Eugene Pasyuk

  • (9-)757 876-1789 , x6020 office

Run Coordinator and Target Expert Schedule

Longterm Run Plan

IMPORTANT NOTE: Before leaving the hall and going to beam permit check that dome lights, froward carriage lights, and pie tower lights are OFF

Run Plan: June 2022

  • Tue, 6/7: Complete beam line; Hall closes up at 3:00 for beam line magnet tests
  • Wed, 6/8: Finish all surveys and alignments, calibrate BPMs. Test target samples (TE, polarize). Check out raster.
  • Thu, 6/9: Continue HCO for all components, target polarization / swap tests. Install cross-hair target probe for beam. If ready, close Hall and get ready for beam.
  • Fri, 6/10: If possible, tune 1-pass beam to FC. Begin commissioning and raster calibration
  • Weekend: Take data with MT, 12C and polarized NH3 targets.
  • Early next week: If time allows, take data on CH2, CD2 and polarized ND3.
  • Then change from 1-pass to 5 pass.

1-pass (2.1 GeV) Running conditions

  • Establish optimal compromise between raster size (if possible, 7 mm radius), luminosity (goal: 5 nA), and background.
  • Run duration 100M events or 4 hours, whichever comes first.
    • For empty target runs, increase beam current as much as possible (up to 50 nA).


DAQ configuration

  • Configuration TBA, trigger file rgc_100MeV_V1.0_no_DC.trg
  • NOTE: UNLESS a RICH problem crashes the DAQ, do NOT interrupt an otherwise smooth run to do a RICH recovery - instead do this in between runs.
  • NOTE: BOTH the shift expert AND the shift worker MUST check monitoring histograms at least once every 30-60 minutes to make sure there are no major detector problems.Watch the raster pattern!
  • At the end of each run, follow the STANDARD DAQ RESTART SEQUENCE:
    • "end run", if the run ended correctly then: "prestart", "go"
    • if the run did not end correctly or if any ROCs had to be rebooted:
      • "cancel", "reset"
      • "configure", "download", "prestart", "go"
  • After each step, make sure it is completed in the Run Control message window. If a ROC has crashed, find which one it is, issue a roc_reboot command ON JUST THAT ROC and try again. Contact the DAQ expert if there are any questions.

References and Standards

Solenoid set-point of 2417.5 A results in read back 2419.57 A and exactly 5.00 T field on center

Nominal Beam Positions

  • 2H01, X: ? mm, Y: ? mm (only used/useful without restoring)
  • 2C24, X: -? mm, Y: ? mm (orbit lock)

FSD Thresholds (to be updated)

  • Upstream: 2000 Hz
  • Midstream: 2000 Hz
  • Downstream: 500000 Hz
  • BOM: 10000
  • 5 ms dwell time

Reference Harp Scans for Beam on Faraday Cup 2H01 [1]

Reference Harp Scans for Beam on Tagger dump 2C21 [2], tagger harp [3]

Reference Monitoring Histograms

Counter rates

  • Upstream counters integrated rates: 0-15 Hz (acceptable up to 100 Hz are acceptable) @50 nA.
  • Midstream counters: 10-20 Hz (acceptable up to 50 Hz) @50 nA.
  • Counting rates of ~ hundreds of Hz may indicate bad beam tune or bleed-through from other Halls.


NOTE: BOTH the shift expert AND the shift worker MUST check monitoring histograms at least once every 30 - 60 minutes to make sure there are no major detector problems.

  • Follow the [Short Term Schedule] as outlined by RC
    • includes Run Plan, DAQ configuration, and References and Standards
  • Keep shift summary up to date in HBLOG. Record all that happens.
  • Do a RICH recovery (press the RICH Recovery button on the GUI) once daily during day shift, between runs. Please log in shift summary.
    • Note the automated "RICH Recovery" sequence already confirms RICH4 is up and accepting ssh connections before claiming success. And it also prints out that you have to "Cancel->Reset->Configure->Download->Prestart" before starting the next run.
  • Fill out BTA hourly. Click "Load from EPICS" to automatically fill the left side then correct as needed.
    • Accelerator beam time:
      • ABU: acceptable beam used (eg harp scans, calibrations, trigger settings, running)
      • BANU: beam acceptable but not used (eg radiator change or our problems)
      • BNA: beam not acceptable (eg tuning, drifting, not focused)
    • Experiment beam time
      • ER: experiment ready
      • PCC: planned configuration change (when beam is masked while radiators are moved, DAQ (roc rebooting, restarting runs)), if more than 5 minutes, put a short comment, eg harp scans or DAQ.
      • UED: unplanned experiment down (hardware failure)


In case of other questions or uncertainties of what to do, call the RC or PDL

(remote) shift worker: see dedicated Remote Shifts tab above.


Tasks

Every Run:

  • With beam present, log screen shots of:
    • Beamline Overview, in VNC or Web Browser
    • CLAS12 Trigger rates and DAQ status

Every Shift:

  • Fill the shift checklist
  • Log screen shots of RICH temperature and scaler maps. Log in HBLOG and RICH logbook.

Regularly:

  • reset & check spectra frequently (every 30 - 60 minutes)
    • Some plots in mon12 have a choice of histogram sets per sector, select buttons at the bottom of the plot. Only the currently selected set ends up in the logbook entry.
    • that means you have to look at all sectors for these histograms
Backup shifter contact info
Name Email Cell phone
Bob Cat bob@cat.org
John Doe johndoe@gmail.com

Webcams

Manuals

Epics on the web

Live Monitoring Links



Clas12design.png