Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 123: | Line 123: | ||
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)</b> | ||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
| valign=top | | | valign=top | |
Revision as of 14:07, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field); Solenoid : +1208 A (50% field)
Important: Document all your work in the logbook!
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:All studies for the next few shifts will use 100% torus field (negatives bending in); the strength of the solenoid field and the status of the hydrogen target are listed below.
While no beam, cosmic calibration run is in progress with all CLAS12 detectors ON. When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) |
General Instructions:
Beam Tuning:
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|