Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 149: | Line 149: | ||
*# repeat harp scans at 2c21, 2c24 (tagger harp) and 2h01: profile should be as in https://logbooks.jlab.org/entry/3502250, https://logbooks.jlab.org/entry/3502252 and https://logbooks.jlab.org/entry/3502313. Make sure you select the proper PMT for the analysis. The profile at 2c21a and 2c24 should be as in the scans performed with beam to the tagger. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan. | *# repeat harp scans at 2c21, 2c24 (tagger harp) and 2h01: profile should be as in https://logbooks.jlab.org/entry/3502250, https://logbooks.jlab.org/entry/3502252 and https://logbooks.jlab.org/entry/3502313. Make sure you select the proper PMT for the analysis. The profile at 2c21a and 2c24 should be as in the scans performed with beam to the tagger. If necessary ask MCC to adjust the beam profile at 2H01 to match the previous scan. | ||
− | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) | + | When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) |
<!-- | <!-- |
Revision as of 14:08, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field); Solenoid : +1208 A (50% field)
Important: Document all your work in the logbook!
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:All studies for the next few shifts will use 100% torus field (negatives bending in); the strength of the solenoid field and the status of the hydrogen target are listed below.
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |
Manuals |
Epics on the web
|