Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 95: | Line 95: | ||
* <s>After the beam in the upstream line is acceptable, call for MCC to turn off and degauss the tagger magnet (this will take 30 min);</s> | * <s>After the beam in the upstream line is acceptable, call for MCC to turn off and degauss the tagger magnet (this will take 30 min);</s> | ||
* <s>Ensure that the solenoid is unmasked in the FSD system;</s> | * <s>Ensure that the solenoid is unmasked in the FSD system;</s> | ||
− | * Tune the beam to the Faraday Cup and complete harp scans at 2C21, 2C24, and 2H01. These scans should match the standard plots (see logbook links under "Beam Tuning"); | + | * <s>Tune the beam to the Faraday Cup and complete harp scans at 2C21, 2C24, and 2H01. These scans should match the standard plots (see logbook links under "Beam Tuning");</s> |
* Position the beam at the center of the target with 1.5 nA beam and perform whatever beam steering at 2C21 and 2H01 is necessary to match the rates seen with last night's tune; | * Position the beam at the center of the target with 1.5 nA beam and perform whatever beam steering at 2C21 and 2H01 is necessary to match the rates seen with last night's tune; | ||
* Once beam tuning is complete move the beam blocker in (beam should be off for this), ask for 5 nA and ask MCC to unmask the FSD; | * Once beam tuning is complete move the beam blocker in (beam should be off for this), ask for 5 nA and ask MCC to unmask the FSD; |
Revision as of 23:53, 14 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : +3770 A (100% field);
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:All studies for the next few shifts will use 100% torus field (negatives bending in); the strength of the solenoid field and the status of the hydrogen target are listed below.
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|