Line 98: | Line 98: | ||
* If rates and currents are acceptable, increase the beam current to 5 nA. Record detector rates and DC currents in the logbook. Ensure that the halo counter FSD threshold are set to their nominal 5 nA values. | * If rates and currents are acceptable, increase the beam current to 5 nA. Record detector rates and DC currents in the logbook. Ensure that the halo counter FSD threshold are set to their nominal 5 nA values. | ||
* Start the DAQ with the production electron trigger (trigger_electron.trg). Take data for 4 hours. | * Start the DAQ with the production electron trigger (trigger_electron.trg). Take data for 4 hours. | ||
+ | * Complete FT optimization | ||
+ | * Complete DC plateau scan to lower HV values (HV settings #4, #5, #6, #7, #8; thresholds of -20 mV, -30 mV) (Consult with Mac Mestayer) | ||
+ | * Perform DC HV/threshold study with settings #8, #9, #9 for R1, R2, R3 with thresholds of -20 mV, -30 mV, -30 mV. | ||
* Continue work on trigger development/optimization. | * Continue work on trigger development/optimization. | ||
* Work on setting detector thresholds and timing windows. | * Work on setting detector thresholds and timing windows. | ||
Line 103: | Line 106: | ||
* If beam is stable, complete a luminosity scan at 10 nA, 30 nA, 50 nA, 70 nA. Record detector rates, currents, and DC occupancies at each luminosity. | * If beam is stable, complete a luminosity scan at 10 nA, 30 nA, 50 nA, 70 nA. Record detector rates, currents, and DC occupancies at each luminosity. | ||
− | + | Measure DC occupancy as function of solenoid field | |
− | |||
| valign=top | | | valign=top | |
Revision as of 08:43, 19 December 2017
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Fall 2017
Beam energy 10.6 GeV (5 pass)
Torus : -3770 A (85% field), Solenoid: 2416 A (100% field), full target;
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
Run Plan:
Measure DC occupancy as function of solenoid field |
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT)
|
Every Shift:
|
Every Run:
|
---|
Webcams |