Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 103: | Line 103: | ||
* <s>Complete RICH optimization studies at a beam current of 50 nA (set appropriate FSD thresholds). See instructions in [https://logbooks.jlab.org/entry/3512632 logbook] for the DAQ settings.</s> | * <s>Complete RICH optimization studies at a beam current of 50 nA (set appropriate FSD thresholds). See instructions in [https://logbooks.jlab.org/entry/3512632 logbook] for the DAQ settings.</s> | ||
* Take data for EC calibration studies for 2 hours at 10 nA. Contact the ECAL expert for this work. Set appropriate FSD thresholds for the chosen current. | * Take data for EC calibration studies for 2 hours at 10 nA. Contact the ECAL expert for this work. Set appropriate FSD thresholds for the chosen current. | ||
− | |||
− | |||
* Take higher luminosity data: | * Take higher luminosity data: | ||
** Complete luminosity scan at currents of 100 nA, 125 nA, 150 nA using a random trigger (FSD settings of 400 upstream, 1000 midstream, 2e6 downstream, and 2e5 BOM). For each setting, record the rates and currents for all subsystems, as well as DC occupancies. Record all information in the logbook. DC time windows should be 250 ns (R1), 500 ns (R2), 750 ns (R3). | ** Complete luminosity scan at currents of 100 nA, 125 nA, 150 nA using a random trigger (FSD settings of 400 upstream, 1000 midstream, 2e6 downstream, and 2e5 BOM). For each setting, record the rates and currents for all subsystems, as well as DC occupancies. Record all information in the logbook. DC time windows should be 250 ns (R1), 500 ns (R2), 750 ns (R3). | ||
** Take data at 75 nA for 2 hr (set proper FSD trip levels) | ** Take data at 75 nA for 2 hr (set proper FSD trip levels) | ||
** Take data at 125 nA for 2 hr (set proper FSD trip levels) | ** Take data at 125 nA for 2 hr (set proper FSD trip levels) | ||
+ | * Complete solenoid field scan: | ||
+ | ** With a beam current of 10-20 nA, study the detector rates and currents for all subsystems, as well as DC occupancies for solenoid field settings of 100%, 90%, 80%, 70%, 60%, 50%. Record all information in the logbook. Set the proper FSD trip levels. | ||
* Take calibration data with the torus at 60% field and the solenoid at 60% field for 8 hours at 10 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | * Take calibration data with the torus at 60% field and the solenoid at 60% field for 8 hours at 10 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | ||
* Take data run for 8 hours at 50 nA (set proper FSD trip levels). | * Take data run for 8 hours at 50 nA (set proper FSD trip levels). |
Revision as of 11:06, 14 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Leave the HV to the FMT off until further notice.
- Note 2: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 3: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 4: Record forces on torus and solenoid sensors in configuration with torus at full field and solenoid at zero field.
- Note 5: When possible during a day time access, call Jennifer Williams to do a magnetic field survey in the hall with torus and solenoid at full field.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|