Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 109: | Line 109: | ||
* Take calibration data with the torus at 60% field and the solenoid at 60% field for 4 hours at 10 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | * Take calibration data with the torus at 60% field and the solenoid at 60% field for 4 hours at 10 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | ||
* Take data run at 50 nA until 4 a.m. (set proper FSD trip levels) with 100% torus field and 100% solenoid field. | * Take data run at 50 nA until 4 a.m. (set proper FSD trip levels) with 100% torus field and 100% solenoid field. | ||
+ | * At 4 a.m. turn off the beam. Turn off HV for all detectors. | ||
* Ramp the solenoid down to 0% field. When at zero solenoid field, put the following screen captures into the logbook: | * Ramp the solenoid down to 0% field. When at zero solenoid field, put the following screen captures into the logbook: | ||
** 1) torus load cell screen | ** 1) torus load cell screen | ||
Line 114: | Line 115: | ||
** 3) solenoid load cell screen | ** 3) solenoid load cell screen | ||
** 4) solenoid EM forces screen | ** 4) solenoid EM forces screen | ||
+ | * At 6 a.m. call to have the hall put into Restricted Access for FT-Off to FT-On configuration change. | ||
| valign=top | | | valign=top | |
Revision as of 11:52, 14 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Leave the HV to the FMT off until further notice.
- Note 2: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 3: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 4: When possible during a day time access, call Jennifer Williams to do a magnetic field survey in the hall with torus and solenoid at full field.
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|