Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 85: | Line 85: | ||
<br> | <br> | ||
− | * Note 1: | + | * Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels. |
− | * Note 2: | + | * Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions. |
− | * Note 3 | + | * Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm) |
− | |||
− | |||
− | |||
− | |||
{| {{TableStyle1}} | {| {{TableStyle1}} | ||
Line 104: | Line 100: | ||
* Complete solenoid field scan: | * Complete solenoid field scan: | ||
** With a beam current of 10-20 nA, study the detector rates and currents for all subsystems, as well as DC occupancies for solenoid field settings of 100%, 90%, 80%, 70%, 60%, 50%. Record all information in the logbook. Set the proper FSD trip levels. | ** With a beam current of 10-20 nA, study the detector rates and currents for all subsystems, as well as DC occupancies for solenoid field settings of 100%, 90%, 80%, 70%, 60%, 50%. Record all information in the logbook. Set the proper FSD trip levels. | ||
+ | ** <b>Note: Only authorized personnel should operate the magnet controls. Contact the PDL Eugene Pasyuk to adjust the solenoid current.</b> | ||
* Take calibration data with the torus at 100% field and the solenoid at 60% field for 4 hours at 25 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | * Take calibration data with the torus at 100% field and the solenoid at 60% field for 4 hours at 25 nA beam current (set proper FSD thresholds). This work is as specified in the Commissioning Run Plan [https://www.jlab.org/Hall-B/calcom/cwb-erun.pdf Phase 1 Step #14]. | ||
− | * | + | ** <b>Note: Only authorized personnel should operate the magnet controls. Contact the PDL Eugene Pasyuk to adjust the solenoid current.</b> |
* At 4 a.m. turn off the beam. Turn off HV for all detectors. | * At 4 a.m. turn off the beam. Turn off HV for all detectors. | ||
* Ramp the solenoid down to 0% field. When at zero solenoid field, put the following screen captures into the logbook: | * Ramp the solenoid down to 0% field. When at zero solenoid field, put the following screen captures into the logbook: | ||
Line 112: | Line 109: | ||
** 3) solenoid load cell screen | ** 3) solenoid load cell screen | ||
** 4) solenoid EM forces screen | ** 4) solenoid EM forces screen | ||
+ | ** <b>Note: Only authorized personnel should operate the magnet controls. Contact the PDL Eugene Pasyuk to adjust the solenoid current.</b> | ||
+ | * When the solenoid is at 0% field, ramp the torus down to 0% field. | ||
+ | ** <b>Note: Only authorized personnel should operate the magnet controls. Contact the PDL Eugene Pasyuk to adjust the torus current.</b> | ||
* At 6 a.m. call to have the hall put into Restricted Access for FT-Off to FT-On configuration change. | * At 6 a.m. call to have the hall put into Restricted Access for FT-Off to FT-On configuration change. | ||
Revision as of 20:32, 14 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm)
Run Plan:
|
General Instructions:
Beam Tuning:
When ready to get beam, Turn all beamline devices ON, turn all CLAS12 detectors OFF (including SVT) Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|