Line 101: | Line 101: | ||
* Begin 1-pass program by tuning 10 nA beam to the tagger magnet yoke dump. Follow the beam tuning procedures for Hall B on the run wiki under Procedures. The beamline expert will oversee this work. Before beam is delivered to Hall B make sure that all detectors are off and the target is empty. The tagger magnet should be at its appropriate setting for the 1-pass energy. The torus and solenoid should be at 100% field (both positive polarity). | * Begin 1-pass program by tuning 10 nA beam to the tagger magnet yoke dump. Follow the beam tuning procedures for Hall B on the run wiki under Procedures. The beamline expert will oversee this work. Before beam is delivered to Hall B make sure that all detectors are off and the target is empty. The tagger magnet should be at its appropriate setting for the 1-pass energy. The torus and solenoid should be at 100% field (both positive polarity). | ||
− | * When the beam tune is acceptable in the upstream | + | * When the beam tune is acceptable in the upstream beamline, turn off/degauss the tagger magnet and tune 10 nA beam to the Faraday Cup. The beamline expert will oversee this work. The beam blocker should be out for the duration of the 1-pass data taking (check with beamline expert) |
* When physics quality beam is established to the Faraday Cup, turn on the forward detectors (ECAL, FTOF, LTCC, HTCC, RICH). Record rates and currents in the logbook. | * When physics quality beam is established to the Faraday Cup, turn on the forward detectors (ECAL, FTOF, LTCC, HTCC, RICH). Record rates and currents in the logbook. | ||
* Fill the cryotarget. | * Fill the cryotarget. |
Revision as of 10:59, 15 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Daniel S. Carman
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 2 -3 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=-0.2 mm, Y=-0.2 mm), 2C24 (X=-0.5 mm, Y=0.9 mm), 2H01 (X=0.5 mm, Y=1.5 mm)
Run Plan:
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|