* Zero field alignment runs:
 
* Zero field alignment runs:
 
** Starting at 8:00 am, ramp the torus to 0 field (call E. Pasuyk and/or RC to do it)
 
** Starting at 8:00 am, ramp the torus to 0 field (call E. Pasuyk and/or RC to do it)
 +
** Empty the target
 
** Establish a beam current of 0.1 nA and start the DAQ with electron trigger
 
** Establish a beam current of 0.1 nA and start the DAQ with electron trigger
 
** Start lowering the solenoid in steps of 10% while monitoring detectors rates (call detector experts and SVT and MVT in particular ahead of time to have them watching their system) and DC occupancies. At 40% solenoid, ask MCC to mask the solenoid relay from the FSD. Continue ramping down the solenoid until rates are sustainable.
 
** Start lowering the solenoid in steps of 10% while monitoring detectors rates (call detector experts and SVT and MVT in particular ahead of time to have them watching their system) and DC occupancies. At 40% solenoid, ask MCC to mask the solenoid relay from the FSD. Continue ramping down the solenoid until rates are sustainable.