Difference between revisions of "Engineering Run"
Jump to navigation
Jump to search
Line 98: | Line 98: | ||
''(last update 1/19 - 4:30 pm)'' | ''(last update 1/19 - 4:30 pm)'' | ||
− | * Once beam is back, establish 5 nA beam current on target. Solenoid is at 60% and torus at 0. Make sure beam positions are consistent with last used values. Check the detector, halo counter and BOM rates on full target. Use FTCAL scalers to check the beam centering. Make logbook entries with snapshots of the overview epics gui and other relevant graph. | + | * <s>Once beam is back, establish 5 nA beam current on target. Solenoid is at 60% and torus at 0. Make sure beam positions are consistent with last used values. Check the detector, halo counter and BOM rates on full target. Use FTCAL scalers to check the beam centering. Make logbook entries with snapshots of the overview epics gui and other relevant graph. |
* Go to empty target: check rates again at the same beam current and compare to full target. | * Go to empty target: check rates again at the same beam current and compare to full target. | ||
* Start DAQ with PROD configuration and trigger_electron_2GEV.trg trigger file: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots) | * Start DAQ with PROD configuration and trigger_electron_2GEV.trg trigger file: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots) | ||
Line 109: | Line 109: | ||
** beam should be off and solenoid masked in the FSD (ask MCC to do it after requesting beam off); | ** beam should be off and solenoid masked in the FSD (ask MCC to do it after requesting beam off); | ||
** ramp the solenoid to 0 and wait 5 min; | ** ramp the solenoid to 0 and wait 5 min; | ||
− | ** ramp the solenoid to -60% (1450 A) | + | ** ramp the solenoid to -60% (1450 A)</s> |
* Start data taking with 3 nA beam current, PROD configuration and trigger_electron_2GEV.trg trigger file: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots). | * Start data taking with 3 nA beam current, PROD configuration and trigger_electron_2GEV.trg trigger file: monitor trigger scalers and monitoring histograms (mon12) to ensure all trigger bits are properly recorded and all detectors are properly readout (compare to previous monitoring plots). | ||
* Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. | * Take 2 hours runs. Monitor routinely trigger scalers, live time, monitoring histograms, CED, detector scalers. |
Revision as of 23:03, 19 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- carman@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". The DAQ rate should be 5 - 6 kHz (this includes a 1 kHz pulser). After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/19 - 4:30 pm)
Beam Tuning:
When ready to get beam, turn all beamline devices ON, turn all CLAS12 detectors OFF |
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|