Line 108: | Line 108: | ||
* Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | * Make sure FSD thresholds are set correctly for the specific beam current used in the following runs. | ||
* Start data taking at 60% field (negatives inbending) and solenoid to 60% field: | * Start data taking at 60% field (negatives inbending) and solenoid to 60% field: | ||
− | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui. | + | ** <s>Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron_2gev_lt.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui.</s> |
** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui. | ** Test production run: 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; Take 60 min of data. Record trigger scaler gui. | ||
** Special Run #1 (DC HV scan): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; take 3 short runs (20 min.) with different DC HV settings (7,8,8), (9,10,10), (10,11,11) as detailed in https://logbooks.jlab.org/entry/3519236. Every time the HV settings are changed use the DC HV Monitoring GUI (from the main Epics GUI select DC-> DC HV Monitoring) to check that the HV settings are correct; compare the values displayed in the GUI with what reported in the table on pg. 5 and 6 of the DC manual at [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf]; take a snapshot of the DC HV monitoring gui and save it to the logbook. '''Once completed, set DC HV at the nominal settings (8,9,9)'''. | ** Special Run #1 (DC HV scan): 5 nA beam current on LH2 target, DAQ configuration PROD (selected by clicking on Configure before the Download), trigger file tr_electron.trg (selected at the Download), beam position as indicated above; take 3 short runs (20 min.) with different DC HV settings (7,8,8), (9,10,10), (10,11,11) as detailed in https://logbooks.jlab.org/entry/3519236. Every time the HV settings are changed use the DC HV Monitoring GUI (from the main Epics GUI select DC-> DC HV Monitoring) to check that the HV settings are correct; compare the values displayed in the GUI with what reported in the table on pg. 5 and 6 of the DC manual at [https://clasweb.jlab.org/wiki/images/b/b2/Drift-chamber-operating-procedure.pdf]; take a snapshot of the DC HV monitoring gui and save it to the logbook. '''Once completed, set DC HV at the nominal settings (8,9,9)'''. |
Revision as of 08:19, 25 January 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Engineering Run, Winter 2018
Beam energy 2.1 GeV (1 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Raffaella De Vita
- (757) 575-7540
- 9 575 7540 from Counting Room
- devita@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.7 mm, Y=-0.5 mm)
Run Plan:(last update 1/24 - 11:00 pm)
|
General Instructions:
Every Shift:
Every Run:
|