Line 106: | Line 106: | ||
* Call MCC for beam at 5nA check that the beam position and rates are Ok before moving to 20 nA | * Call MCC for beam at 5nA check that the beam position and rates are Ok before moving to 20 nA | ||
* Once the beam quality is establiched call Sergey and valery to start the runs for trigger studies (Random & HTCC efficiency studies and FT) this will take about 5 to 6 hours | * Once the beam quality is establiched call Sergey and valery to start the runs for trigger studies (Random & HTCC efficiency studies and FT) this will take about 5 to 6 hours | ||
− | * Once the trigger studies completed contact RICH detctor expert to change RICH detecor configuration | + | * 11:30 Maxime started the gas for the MVT then he will turn the HV on |
+ | * Once the trigger studies completed contact RICH detctor expert to change RICH detecor configuration | ||
*Then ask MCC for 15 nA and start production runs | *Then ask MCC for 15 nA and start production runs | ||
* Take data at 15 nA with PROD/elec_6gev_htcc_1phe_pcal_150.trg for 2 hours | * Take data at 15 nA with PROD/elec_6gev_htcc_1phe_pcal_150.trg for 2 hours | ||
− | * Continue data taking at 15nA starting a new run every 2 hours until | + | * Continue data taking at 15nA starting a new run every 2 hours until 6:30 am |
+ | * At 6:30, first tunr of HV for MVT, once the Hv channels are OFF (~30 sec for the ramp down), turn off MVT gas OFF. | ||
+ | * At 7:00 am MVT expert will come to take a run without gas flow, it will be dedicated run of 15-20 mn | ||
<!-- == <font color=blue>''' Beam Tuning:'''</font>== | <!-- == <font color=blue>''' Beam Tuning:'''</font>== |
Revision as of 23:43, 8 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/7 - 09:00) The beam position should be as indicated above. Make sure FSD thresholds are set correctly for whatever current is selected (refer to instructions in the "Establish-physics quality beam" procedure at [1]), integration time is set to 5 ms, and that the orbit locks are on.
|
General Instructions:
Every Shift:
Every Run:
|