Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 94: | Line 94: | ||
== <font color=blue>''' Run Plan:'''</font>== | == <font color=blue>''' Run Plan:'''</font>== | ||
''(last update 2/9 - 08:30)'' | ''(last update 2/9 - 08:30)'' | ||
− | *<font color=red> '''Due to the machine retunning today's day and swing shifts are cancelled. The current plan is to resume shift this midnight 00:00 February 11. We will notify you if there are any changes.'''</font> | + | *<font color=red> '''Due to the machine retunning today's day and swing shifts are cancelled. The current plan is to resume shift this midnight 00:00 February 11. We will notify you if there are any changes. |
+ | * '''Once we know when we will get beam we will post step by step run plan to receive beam and start of data taking | ||
+ | '''</font> | ||
<!-- | <!-- | ||
Line 115: | Line 117: | ||
* At 6:30, first turn off HV for MVT, once the HV channels are OFF (~30 sec for the ramp down), turn off MVT gas OFF. | * At 6:30, first turn off HV for MVT, once the HV channels are OFF (~30 sec for the ramp down), turn off MVT gas OFF. | ||
* At 7:00 am MVT expert will come to take a run without gas flow, it will be dedicated run of 15-20 mn--> | * At 7:00 am MVT expert will come to take a run without gas flow, it will be dedicated run of 15-20 mn--> | ||
+ | |||
<!--<font color=blue>''' Prepare For Beam Tuning:'''</font> | <!--<font color=blue>''' Prepare For Beam Tuning:'''</font> |
Revision as of 14:06, 10 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting |
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 6.4 GeV (3 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2C21 (X=0.0 mm, Y=0.0 mm), 2C24 (X=0.0 mm, Y=0.7 mm), 2H01 (X=0.3 mm, Y=-0.6 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/9 - 08:30)
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|
Hall-B |
Accelerator |
Bluejean meetings
|