Difference between revisions of "Run Group A"
Jump to navigation
Jump to search
Line 129: | Line 129: | ||
*<s> Once MCC ready to deliver beam call Beam line expert and follow the procedure outlined in section 1 in Establishing Physics-Quality Beam document at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to establish good quality beam to tagger-yoke dump. </s> <font color = green> '''Completed 17:25'''</font> | *<s> Once MCC ready to deliver beam call Beam line expert and follow the procedure outlined in section 1 in Establishing Physics-Quality Beam document at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf] to establish good quality beam to tagger-yoke dump. </s> <font color = green> '''Completed 17:25'''</font> | ||
* <s>Once beam beam quality established at the tagger proceed with Moller run measurements of the polarization at the 2 half wave plates in and out following the procedure as outlined in the '''Performing Møller Runs''' document https://wiki.jlab.org/clas12-run/images/1/1d/Moller.pdf </s> <font color = green> '''Completed 20:10'''</font> | * <s>Once beam beam quality established at the tagger proceed with Moller run measurements of the polarization at the 2 half wave plates in and out following the procedure as outlined in the '''Performing Møller Runs''' document https://wiki.jlab.org/clas12-run/images/1/1d/Moller.pdf </s> <font color = green> '''Completed 20:10'''</font> | ||
− | * Once the measurement of the polarization is completed we proceed with beam tuning to the FC following the procedure outlined in section 2 in Establishing-Quality Beam document at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. | + | *<s> Once the measurement of the polarization is completed we proceed with beam tuning to the FC following the procedure outlined in section 2 in Establishing-Quality Beam document at [https://wiki.jlab.org/clas12-run/images/e/e3/Estab_beam.pdf]. |
* Once beam quality established to the FC we turn on all the detectors except SVT ask MCC for beam current of 5 nA making sure that experiment monitoring/rates of all detector are good, make sure that the beam is well centred | * Once beam quality established to the FC we turn on all the detectors except SVT ask MCC for beam current of 5 nA making sure that experiment monitoring/rates of all detector are good, make sure that the beam is well centred | ||
* <font color = red>'''Call Yuri to turn on SVT''' </font> | * <font color = red>'''Call Yuri to turn on SVT''' </font> | ||
− | * Put beam blocker in | + | * Put beam blocker in</s> |
* Ask MCC increase the current to 20 nA then to 30 nA | * Ask MCC increase the current to 20 nA then to 30 nA | ||
* Take production for one hour @ 30nA with trigger file: trigger_v3.trg (Put the comment on the run spreadsheet New PCAL Firmware in the trigger for this run) | * Take production for one hour @ 30nA with trigger file: trigger_v3.trg (Put the comment on the run spreadsheet New PCAL Firmware in the trigger for this run) |
Revision as of 22:54, 16 February 2018
[edit]
Shift ScheduleShift ChecklistHot CheckoutBeam Time Accounting
|
Manuals |
Procedures |
JLab Logbooks
|
|
|
- Note, all non-JLab numbers must be dialed with an area code. When calling from a counting-house landline, dial "9" first.
- To call JLab phones from outside the lab, all 4-digit numbers must be preceded by 757-269
- Click Here to edit Phone Numbers. Note, you then also have to edit the current page to force a refresh.
Click Here to edit Phone Numbers. Note, you then also have to edit this page to force a refresh.
CLAS12 Run Group A, Winter 2018
Beam energy 10.6 GeV (5 pass)
Important: Document all your work in the logbook!
Remember to fill in the run list at the beginning and end of each run (clas12run@gmail.com can fill the run list)
RC: Latifa Elouadrhiri
- (757) 575-7540
- 9 575 7540 from Counting Room
- latifa@jlab.org
PDL: Eugene Pasyuk
- (757) 876-1789
- 9 876-1789 from Counting Room
- pasyuk@jlab.org
- Note 1: Be very mindful of the background rates in the halo counters, rates in the detectors, and currents in the SVT for all settings to ensure that they are at safe levels.
- Note 2: At the end of each run, follow the DAQ restart sequence "end run", "abort", "reset", "download", "prestart", "go". After DAQ prestart is complete reboot the scaler IOCs with the command: iocjscalerRestartAll.sh. Note: After each step, make sure it is complete in the Run Control message window. If a roc has crashed, find which one it is and issue a roc_reboot command and try again. Contact the DAQ expert if there are any questions.
- Note 3: Nominal beam positions: 2H01 (X=0.7 mm, Y=-2.0 mm)
- Note 4: With beam to the Faraday Cup, typical rates on all halo counters upstream from the target should be either 0 or of the order of few counts. Count rates in the range of tens or more may indicate bad beam tune or bleed-through from other Halls.
Run Plan:(last update 2/16- 15:00)
February 16 swing and February 17 owl & day Shifts
|
General Instructions:
Every Shift:
Every Run:
|
Webcams |
Manuals |
Epics on the web
|
Hall-BRun lists |
Accelerator |
Bluejean meetings
|